Loading...
HomeMy WebLinkAbout2022-06-02FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 6/2/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - PW lines - Work on the grading for the landscaping continues - Testing for leaks continues - Leak and pipe repair continues for the PW line 2 Daniel Ford No 90-CHEMICAL FACILITY - Welding and installing chem piping - Water lines in chem building 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes -Helped deal with the chlorine -Skimmed all water surfaces with the butterfly net -Pressure washed Opps building -Cleaned all windows and doors in Opps building -Wiped down Maintenance building -Emptied trash everywhere 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Supports at cassette tank were being fabricated and installed   MANPOWER LOG 15 Workers  |   124.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.3 8.0 24.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS     FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 11:03 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Manny Hernandez Jaren Unfried Created By:  Daniel Ford  3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Carpenters Enrique Padilla     FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 11:03 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  11 Dahl Insulation 1 8.0 8.0     Notes:Created By:  Monica Weiss   12 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      15  124.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    6-2-2022 Daily Report.xls   11.  Dahl Insulation  0602 DAHL STA.pdf 12.  Parada Painting Inc.  0602 PARADA STA.pdf   FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 11:03 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:00PM   Miner's Ace Hardware 739473 A20    Comments:Created By: Monica Weiss 2 12:00PM   HD Supply White Cap RETURN    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.06.02 Miners 739473 A20 Plugs.pdf   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 11:03 AM PST        2.  2022.06.02 White Cap Return.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 49°F 67°F 56°F 0.00 in.0.00 in.0.00 in.60%84%100%50°F 3.0 mph 5 mph 6 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   50°F Cloudy   55°F Cloudy   68°F Cloudy   64°F Cloudy   60°F Clear   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:40:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 11:03 AM PST