HomeMy WebLinkAbout2022-06-03FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 6/3/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- PW lines
- Work on the grading for the landscaping continues
- Testing for leaks continues
- Leak and pipe repair continues for the PW line
2 Daniel Ford No 90-CHEMICAL FACILITY
- Welding and installing chem piping
- Water lines in chem building
3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
-Finished emptying the trash
-Detailed the maintenance building
-Cleaning Exterior of the RO building
4 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Supports at cassette tank were being fabricated and installed
5 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- We installed the added supports for the defusers in both SHT
tanks
MANPOWER LOG 13 Workers | 104.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 ELECTRICRAFT, INC.3 8.0 24.0
Notes:Created By: Rick Howland
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 11:04 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
2 Dahl Insulation 1 8.0 8.0 30-TREATMENT
AREA
Notes:Metal jacket compressed air lines
Created By: Eric Girten
3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Manny Hernandez
Jaren Unfried
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Forman
Phil Lacey
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 11:04 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Johnathan Torres
Created By: Daniel Ford
11 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Carpenters
Enrique Padilla
Created By: Daniel Ford
13 104.0
Manpower Log's Attachments:
1. ELECTRICRAFT, INC.
6-3-2022 Daily Report.xls
2. Dahl Insulation
0603 DAHL STA.pdf
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 11:04 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
3 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 12:00PM Airgas Bottle return, Nitro for gas line
Comments:Created By: Monica Weiss
2 12:15PM Burt Ind 108317 471-325
Comments:Created By: Monica Weiss
3 12:00PM HD Supply White Cap 47373348 Safety
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.06.03 Airgas Nitro 2363.pdf 2022.06.03 Airgas Bottle Return.pdf
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 11:04 AM PST
2.
2022.06.03 Burt Ind 108317 471-325.pdf
3.
2022.06.03 White Cap Safety 47373348.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
50°F 62°F 54°F 0.00 in.0.00 in.0.00 in.83%94%100%52°F 4.2 mph 8 mph 16 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Cloudy
51°F
Cloudy
53°F
Cloudy
61°F
Cloudy
62°F
Fog
56°F
Fog
54°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:30:00 AM No
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 11:04 AM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 11:04 AM PST