HomeMy WebLinkAbout2022-06-06FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 6/6/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- PW lines
- Work on the grading for the landscaping continues
- Testing for leaks continues
- Leak and pipe repair continues for the PW line
- The flag pole at the operations building was installed today
2 Daniel Ford No 90-CHEMICAL FACILITY
- Welding and installing chem piping
- Water lines in chem building
- We mover a lot of the scales and skids for the painters to get
in there to do there work today.
3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
-We continue to collect foties and skim out the tops of tanks
-Both entrances were swept and cleared of rocks from the
new entrances.
-The Exterior of the RO and Maintenance building were wiped
down.
We started wiping down the interior doors and windows in the
ro and maintenance buildings
4 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
-We are working on the supports for the bower piping on the
MBR slab.
5 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- We installed the added supports for the defusers in both SHT
tanks
FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 11:04 AM PST
MANPOWER LOG 14 Workers | 116.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Manny Hernandez
Jaren Unfried
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 11:04 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Johnathan Torres
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Carpenters
Enrique Padilla
Created By: Daniel Ford
10 Dahl Insulation 1 8.0 8.0 70-RESIDUALS
AREA
Notes:Shower/eyewash hot water line
Created By: Eric Girten
11 ELECTRICRAFT, INC.2 8.0 16.0
Notes:Created By: Rick Howland
12 Parada Painting Inc.2 10.0 20.0
Notes:Created By: Monica Weiss
14 116.0
Manpower Log's Attachments:
10. Dahl Insulation
0606 DAHL STA.pdf
11. ELECTRICRAFT, INC.
6-6-2022 Daily Report.xls
FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 11:04 AM PST
12. Parada Painting Inc.
0606 PARADA STA.pdf
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 Yes 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 12:00PM H2O Innovation Endress & Hauser part
Comments:Created By: Monica Weiss
2 12:00PM HARRINGTON INDUSTRIAL
PLASTICS LLC
Compression tube connector
Comments:Created By: Monica Weiss
3 12:00PM HARRINGTON INDUSTRIAL
PLASTICS LLC
471-381
Comments:Created By: Monica Weiss
FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 11:04 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
4 12:00PM HARRINGTON INDUSTRIAL
PLASTICS LLC
471-381 Epdm Gaskets
Comments:Created By: Monica Weiss
5 12:00PM HARRINGTON INDUSTRIAL
PLASTICS LLC
471-381 Viton Gaskets
Comments:Created By: Monica Weiss
6 12:00PM HARRINGTON INDUSTRIAL
PLASTICS LLC
Compression Fittings
Comments:Created By: Monica Weiss
7 12:00PM HARRINGTON INDUSTRIAL
PLASTICS LLC
A90 Gaskets
Comments:Created By: Monica Weiss
8 12:00PM Miner's Ace Hardware 739732 Cleaning Supplies
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.06.06 H2O Inno Endress & Hauser.pdf
FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 11:04 AM PST
2.
2022.06.06 Harrington .75in Comp Tube.pdf
3.
2022.06.06 Harrington 471-381 (2).pdf
4.
2022.06.06 Harrington 471-381 EPDM Gaskets.pdf
FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 11:04 AM PST
5.
2022.06.06 Harrington 471-381.pdf
6.
2022.06.06 Harrington comp tube.pdf
7.
2022.06.06 Harrington Gaskets A90.pdf
FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 11:04 AM PST
8.
2022.06.06 Miners 739734 Cleaning.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
54°F 59°F 57°F 0.00 in.0.00 in.0.00 in.80%90%100%54°F 5.7 mph 10 mph 16 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Partly Cloudy
54°F
Partly Cloudy
57°F
Partly Cloudy
58°F
Partly Cloudy
60°F
Partly Cloudy
58°F
Clear
55°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:25:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 11:04 AM PST