Loading...
HomeMy WebLinkAbout2022-06-06FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 6/6/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - PW lines - Work on the grading for the landscaping continues - Testing for leaks continues - Leak and pipe repair continues for the PW line - The flag pole at the operations building was installed today 2 Daniel Ford No 90-CHEMICAL FACILITY - Welding and installing chem piping - Water lines in chem building - We mover a lot of the scales and skids for the painters to get in there to do there work today. 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes -We continue to collect foties and skim out the tops of tanks -Both entrances were swept and cleared of rocks from the new entrances. -The Exterior of the RO and Maintenance building were wiped down. We started wiping down the interior doors and windows in the ro and maintenance buildings 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System -We are working on the supports for the bower piping on the MBR slab. 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - We installed the added supports for the defusers in both SHT tanks   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 11:04 AM PST          MANPOWER LOG 14 Workers  |   116.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 11:04 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Carpenters Enrique Padilla Created By:  Daniel Ford    10 Dahl Insulation 1 8.0 8.0 70-RESIDUALS AREA     Notes:Shower/eyewash hot water line Created By:  Eric Girten    11 ELECTRICRAFT, INC.2 8.0 16.0     Notes:Created By:  Rick Howland   12 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      14  116.0    Manpower Log's Attachments:  10.  Dahl Insulation  0606 DAHL STA.pdf 11.  ELECTRICRAFT, INC.    6-6-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 11:04 AM PST        12.  Parada Painting Inc.  0606 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 Yes  12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:00PM   H2O Innovation Endress & Hauser part    Comments:Created By: Monica Weiss 2 12:00PM   HARRINGTON INDUSTRIAL PLASTICS LLC Compression tube connector    Comments:Created By: Monica Weiss 3 12:00PM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-381    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 11:04 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   4 12:00PM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-381 Epdm Gaskets    Comments:Created By: Monica Weiss 5 12:00PM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-381 Viton Gaskets    Comments:Created By: Monica Weiss 6 12:00PM   HARRINGTON INDUSTRIAL PLASTICS LLC Compression Fittings    Comments:Created By: Monica Weiss 7 12:00PM   HARRINGTON INDUSTRIAL PLASTICS LLC A90 Gaskets    Comments:Created By: Monica Weiss 8 12:00PM   Miner's Ace Hardware 739732 Cleaning Supplies    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.06.06 H2O Inno Endress & Hauser.pdf   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 11:04 AM PST        2.  2022.06.06 Harrington .75in Comp Tube.pdf 3.  2022.06.06 Harrington 471-381 (2).pdf 4.  2022.06.06 Harrington 471-381 EPDM Gaskets.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 11:04 AM PST        5.  2022.06.06 Harrington 471-381.pdf 6.  2022.06.06 Harrington comp tube.pdf 7.  2022.06.06 Harrington Gaskets A90.pdf   FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 11:04 AM PST        8.  2022.06.06 Miners 739734 Cleaning.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 59°F 57°F 0.00 in.0.00 in.0.00 in.80%90%100%54°F 5.7 mph 10 mph 16 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   54°F Partly Cloudy   57°F Partly Cloudy   58°F Partly Cloudy   60°F Partly Cloudy   58°F Clear   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:25:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 11:04 AM PST