Loading...
HomeMy WebLinkAbout2022-06-07FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 6/7/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - PW lines - Work on the grading for the landscaping continues - 2 Daniel Ford No 90-CHEMICAL FACILITY - Painters are working on this area - We moved a lot of the scales and skids for the painters to get in there to do there work today. 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - We continue to collect floaties and skim out the tops of tanks - Both entrances were swept and cleared of rocks from the new entrances. - The Exterior of the RO and Maintenance building were wiped down. - We started wiping down the interior doors and windows in the ro and maintenance buildings 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We are working on the supports for the bower piping on the MBR slab - Supports for the cassette tank were worked on as well 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Work continues for the added course screen diffusers.   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 11:04 AM PST          MANPOWER LOG 11 Workers  |   92.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 11:04 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Apprentice Carpenters Enrique Padilla Created By:  Daniel Ford    10 ELECTRICRAFT, INC.1 8.0 8.0     Notes:Created By:  Rick Howland   11 Dahl Insulation 1 8.0 8.0     Notes:Created By:  Monica Weiss   12 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      11  92.0    Manpower Log's Attachments:  10.  ELECTRICRAFT, INC.    6-7-2022 Daily Report.xls   11.  Dahl Insulation  0607 DAHL STA.pdf   FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 11:04 AM PST        12.  Parada Painting Inc.  0607 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 Yes  12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:00PM   Fastenal Diffusor Anhors    Comments:Created By: Monica Weiss 2 12:00PM   Ferguson Enterprises, LLC 471-383 2" YP PVC    Comments:Created By: Monica Weiss 3 12:00PM   Grainger 471-322 A90    Comments:Created By: Monica Weiss 4 12:00PM   Grainger 471-233 Ball Valve    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 11:04 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   5 12:00PM   HD Supply White Cap 47478442 Safety    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.06.07 Fastenal Diffuser Anchors.pdf 2.  2022.06.07 Ferguson 2in PVC 471-383 YP.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 11:04 AM PST        3.  2022.06.07 Grainger 471-322 A90.pdf 4.  2022.06.07 Grainger Ball Valve 471-233.pdf 5.  2022.06.07 White Cap 47478442 Safety.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 58°F 54°F 0.00 in.0.00 in.0.00 in.77%86%96%50°F 5.7 mph 10 mph 15 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 11:04 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   50°F Clear   53°F Clear   56°F Clear   57°F Clear   57°F Clear   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 11:04 AM PST