HomeMy WebLinkAbout2022-06-08FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Wednesday 6/8/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- PW lines continued to be tested and pressurized
- Work on the grading for the landscaping continues
- Backflow preventer was reinstalled near the opps building
today.
- PRW hose bibs were worked on today.
2 Daniel Ford No 90-CHEMICAL FACILITY
- Painters are working on this area
- Flowmeters are being worked on for this area.
3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- Cleaned out Cassette tank area
- Wiped and cleaned up grease from valves
- Moved K rail to Vacor Pad
- Cleaned/Windows in RO, and maintenance bld
4 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- We are working on the supports for the bower piping on the
MBR slab
- Supports for the cassette tank were worked on as well
5 Daniel Ford No 17-OUTDOOR STORAGE
AREA
-Eco blocks were delivered,
-layout was doen and Eco blocks were placed in building 17
6 Ernie Peterson No 00-GENERAL
Notes Log's Attachments:
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 11:05 AM PST
6.
KCI Environmental Inc 6-8-2022 - Rock Mulch - STA FILL.pdf
MANPOWER LOG 16 Workers | 132.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 Dahl Insulation 1 8.0 8.0 30-TREATMENT
AREA
Notes:Blower piping around pipe supports
Created By: Eric Girten
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Manny Hernandez
Jaren Unfried
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 11:05 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Johnathan Torres
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Apprentice Carpenters
Enrique Padilla
Created By: Daniel Ford
11 ELECTRICRAFT, INC.2 8.0 16.0
Notes:Created By: Rick Howland
12 Parada Painting Inc.2 10.0 20.0
Notes:Created By: Monica Weiss
13 KCI Environmental 3 8.0 24.0 00-GENERAL
Notes:start rock mulch installation
Created By: Ernie Peterson
16 132.0
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 11:05 AM PST
Manpower Log's Attachments:
1. Dahl Insulation
0608 DAHL STA.pdf
11. ELECTRICRAFT, INC.
6-8-2022 Daily Report.xls
12. Parada Painting Inc.
0608 PARADA STA.pdf
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 Yes 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 11:05 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 12:00PM Borger Rotary Lobe Pumps
Comments:Created By: Monica Weiss
2 12:00PM MID-STATE CONCRETE
PRODUCTS, LLC
Eco Blocks
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.06.08 Borger Rotary Lobe Pumps.pdf
2.
2022.06.08 Midstate Eco Blocks.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
49°F 63°F 57°F 0.00 in.0.00 in.0.00 in.62%81%91%51°F 5.1 mph 9 mph 15 mph
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 11:05 AM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
52°F
Clear
59°F
Clear
61°F
Clear
61°F
Clear
60°F
Clear
57°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 05:45:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 11:05 AM PST