Loading...
HomeMy WebLinkAbout2022-06-09FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 6/9/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - PW lines continued to be tested and pressurized - Work on the grading for the landscaping continues - PRW hose bibs were worked on today. - We are working on the grade in the ravine 2 Daniel Ford No 90-CHEMICAL FACILITY - Painters are working on this area - Flowmeters are being worked on for this area. 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - site clean up - cleaning up slabs on the northern side of the projects - cleaning up rocks at both entrances on the asphalt 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We are working on the supports for the bower piping on the MBR slab - Supports for the cassette tank were worked on as well 5 Daniel Ford No 17-OUTDOOR STORAGE AREA -Eco blocks were delivered, -layout was done and Eco blocks were placed in building 17 6 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - We are installing an additional hose bib in this area as directed by the city 7 Daniel Ford No 20-HEADWORKS AREA - We are taking care of punch list items in this area. 8 Ernie Peterson No 00-GENERAL Notes Log's Attachments:   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 11:05 AM PST        8.  KCI Environmental Inc 6-9-2022 - Rock Mulch - STA FILL.pdf   MANPOWER LOG 16 Workers  |   132.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Insulate blower system and metal jacket around pipe supports Created By:  Eric Girten    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 11:05 AM PST        No.Contact/Company Workers # Hours Man Hours Location     5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Apprentice Carpenters Enrique Padilla Created By:  Daniel Ford    11 ELECTRICRAFT, INC.2 8.0 16.0     Notes:Created By:  Rick Howland   12 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss   13 KCI Environmental 3 8.0 24.0 00-GENERAL     Notes:Created By:  Ernie Peterson      16  132.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 11:05 AM PST        1.  Dahl Insulation  0609 DAHL STA.pdf 11.  ELECTRICRAFT, INC.    6-9-2022 Daily Report.xls   12.  Parada Painting Inc.  0609 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 Yes  12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 11:05 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:00PM   Ferguson Enterprises, LLC 471-380    Comments:Created By: Monica Weiss 2 12:00PM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-377 Chem Vaults    Comments:Created By: Monica Weiss 3 12:00PM   MID-STATE CONCRETE PRODUCTS, LLC ECO Blocks    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.06.09 Ferguson 471-380 YP.pdf 2022.06.08 Supply house 471-378.pdf 2.  2022.06.09 Harrington 471-377 hem Vaults.pdf   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 11:05 AM PST        3.  2022.06.09 Midstate Concrete ECO Blocks.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 62°F 58°F 0.00 in.0.00 in.0.00 in.67%79%96%52°F 4.6 mph 7 mph 11 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   53°F Clear   60°F Partly Cloudy   60°F Partly Cloudy   62°F Partly Cloudy   62°F Clear   60°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 09:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 11:05 AM PST