HomeMy WebLinkAbout2022-06-10FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 6/10/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- Risers at fire hydrants are being installed
- The ravine area is being graded
2 Daniel Ford No 90-CHEMICAL FACILITY
- Painters are working on this area
- Flowmeters are being worked on for this area.
3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- site clean up
- cleaning up slabs on the northern side of the projects
- cleaning up rocks at both entrances on the asphalt
4 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- We are working on the supports for the bower piping on the
MBR slab
- Supports for the cassette tank were worked on as well
5 Daniel Ford No 17-OUTDOOR STORAGE
AREA
-Eco blocks were delivered,
-layout was done and Eco blocks were placed in building 17
6 Daniel Ford No 70-RESIDUALS AREA>73-
Residuals Area - SAFE
Filter System
- We are installing an additional hose bib in this area as
directed by the city
7 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- We are working on some punch list items in that area
8 Ernie Peterson No
Notes Log's Attachments:
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 11:05 AM PST
8.
KCI Environmental Inc 6-10-2022 - Rock Mulch - STA FILL.pdf
MANPOWER LOG 14 Workers | 116.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 Dahl Insulation 1 8.0 8.0 30-TREATMENT
AREA
Notes:Blower piping. Metal jacket compressed air
Created By: Eric Girten
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Manny Hernandez
Jaren Unfried
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 11:05 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Johnathan Torres
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Apprentice Carpenters
Enrique Padilla
Created By: Daniel Ford
11 Parada Painting Inc.2 10.0 20.0
Notes:Created By: Monica Weiss
12 KCI Environmental 3 8.0 24.0 00-GENERAL
Notes:Created By: Ernie Peterson
14 116.0
Manpower Log's Attachments:
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 11:05 AM PST
1. Dahl Insulation
0610 DAHL STA.pdf
11. Parada Painting Inc.
0610 PARADA STA.pdf
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 Yes 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 11:05 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 12:00PM Ferguson Enterprises, LLC Hydrant Extension
Comments:Created By: Monica Weiss
2 12:00PM Ferguson Enterprises, LLC 471-388 2in Couplings
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.06.10 Ferguson Hydrant Extension 471-386.pdf
2.
2022.06.10 Ferguson 2in couplings 471-383 YP.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
54°F 74°F 63°F 0.00 in.0.00 in.0.00 in.47%70%97%52°F 2.7 mph 5 mph 6 mph
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 11:05 AM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
59°F
Clear
74°F
Clear
73°F
Clear
73°F
Clear
61°F
Clear
61°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:40:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 11:05 AM PST