Loading...
HomeMy WebLinkAbout2022-06-10FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 6/10/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - Risers at fire hydrants are being installed - The ravine area is being graded 2 Daniel Ford No 90-CHEMICAL FACILITY - Painters are working on this area - Flowmeters are being worked on for this area. 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - site clean up - cleaning up slabs on the northern side of the projects - cleaning up rocks at both entrances on the asphalt 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We are working on the supports for the bower piping on the MBR slab - Supports for the cassette tank were worked on as well 5 Daniel Ford No 17-OUTDOOR STORAGE AREA -Eco blocks were delivered, -layout was done and Eco blocks were placed in building 17 6 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - We are installing an additional hose bib in this area as directed by the city 7 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - We are working on some punch list items in that area 8 Ernie Peterson No Notes Log's Attachments:   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 11:05 AM PST        8.  KCI Environmental Inc 6-10-2022 - Rock Mulch - STA FILL.pdf   MANPOWER LOG 14 Workers  |   116.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Blower piping. Metal jacket compressed air Created By:  Eric Girten    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 11:05 AM PST        No.Contact/Company Workers # Hours Man Hours Location     5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Apprentice Carpenters Enrique Padilla Created By:  Daniel Ford    11 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss   12 KCI Environmental 3 8.0 24.0 00-GENERAL     Notes:Created By:  Ernie Peterson      14  116.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 11:05 AM PST        1.  Dahl Insulation  0610 DAHL STA.pdf 11.  Parada Painting Inc.  0610 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 Yes  12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 11:05 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:00PM   Ferguson Enterprises, LLC Hydrant Extension    Comments:Created By: Monica Weiss 2 12:00PM   Ferguson Enterprises, LLC 471-388 2in Couplings    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.06.10 Ferguson Hydrant Extension 471-386.pdf 2.  2022.06.10 Ferguson 2in couplings 471-383 YP.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 74°F 63°F 0.00 in.0.00 in.0.00 in.47%70%97%52°F 2.7 mph 5 mph 6 mph   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 11:05 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   59°F Clear   74°F Clear   73°F Clear   73°F Clear   61°F Clear   61°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:40:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 11:05 AM PST