Loading...
HomeMy WebLinkAbout2022-06-14FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 6/14/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - Backfiling for landscapers is ongoing in various spots all over the job - yard organization is ongoing - We are pulling tubing for the chemical system in the vaults all over the job site - The grouting continues under pipe supports on the MBR slab and the sht 2 Daniel Ford No 90-CHEMICAL FACILITY - Painters are working on this area - Flowmeters are being worked on for this area. - Tubing is being run for the chemical lines - All the copper has been connected 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - site clean up - cleaning up slabs on the northern side of the projects - cleaning up rocks at both entrances on the asphalt - Monthly maintenance is being performed on Headworks, odor control, fine screens , the BNR, safe filter and the MBR 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Filtrate pump 1 is being worked on - The air valves on the top are being replaced with different models 5 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Monthly maintenance is being performed on this unit 6 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - The supports are being grouted - Temp supports are being moved and the holes patched back in 7 Ernie Peterson No 00-GENERAL   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 11:06 AM PST        Notes Log's Attachments: 7.  KCI Environmental Inc 6-14-2022 - Rock Mulch - STA FILL.pdf   MANPOWER LOG 15 Workers  |   124.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Dahl Insulation 2 8.0 16.0 30-TREATMENT AREA     Notes:Insulate/ metal jacket compressed air lines Created By:  Eric Girten    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 11:06 AM PST        No.Contact/Company Workers # Hours Man Hours Location     5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Carpenters Enrique Padilla Created By:  Daniel Ford    10 Parada Painting Inc.2 10.0 20.0     Notes:Parada Created By:  Monica Weiss    11 KCI Environmental 3 8.0 24.0 00-GENERAL     Notes:Created By:  Ernie Peterson      15  124.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 11:06 AM PST        1.  Dahl Insulation  0614 DAHL STA.pdf 10.  Parada Painting Inc.  0614 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 Yes  12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 11:06 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:00PM   Poly Tube Connector    Comments:Created By: Monica Weiss   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 60°F 57°F 0.00 in.0.00 in.0.00 in.68%77%89%50°F 5.0 mph 8 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   52°F Clear   59°F Clear   61°F Clear   60°F Clear   59°F Clear   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 11:06 AM PST