Loading...
HomeMy WebLinkAbout2022-06-15FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 6/15/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - We are cleaning the drain and the level spreader - yard organization is ongoing - We are pulling tubing for the chemical system in the vaults all over the job site - The grouting continues under pipe supports on the MBR slab and the sht - The sample line has been run from the Calcite area to the IPR area 2 Daniel Ford No 90-CHEMICAL FACILITY - Painters are working on this area - Flowmeters are being worked on for this area. - Tubing is being run for the chemical lines - All the copper has been connected 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - site clean up - cleaning up slabs on the northern side of the projects - cleaning up rocks at both entrances on the asphalt - Monthly maintenance is being performed on BNR, MBR, 4 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - The supports are being grouted - Temp supports are being moved and the holes patched back in 5 Ernie Peterson No 00-GENERAL Notes Log's Attachments:   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 11:06 AM PST        5.  KCI Environmental Inc 6-15-2022 - Rock Mulch - STA FILL.pdf   MANPOWER LOG 12 Workers  |   100.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 11:06 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    8 Dahl Insulation 1 8.0 8.0 90-CHEMICAL FACILITY     Notes:Insulate/metal jacket hot water copper line Created By:  Eric Girten    9 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss   10 KCI Environmental 2 8.0 16.0 00-GENERAL     Notes:Created By:  Ernie Peterson      12  100.0    Manpower Log's Attachments:  8.  Dahl Insulation  0615 DAHL STA.pdf   FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 11:06 AM PST        9.  Parada Painting Inc.  0615 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 Yes  12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:00PM   Standard Electric Aluminum Rail    Comments:Created By: Monica Weiss 2 02:00PM   McMaster-CARR Spill kit for Mercury    Comments:Trojan UV Created By: Monica Weiss 3 02:00PM   Ferguson Enterprises, LLC Final Copper Pieces A90    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 11:06 AM PST        1.  2022.06.15 Standard Electric Alum Rail.pdf 2.  2022.06.15 Mcmaster Carr Spill Kit for Mercury.pdf 3.  2022.06.15 Ferguson Copper A90.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 62°F 56°F 0.00 in.0.00 in.0.00 in.65%78%88%49°F 5.0 mph 8 mph 13 mph   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 11:06 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   52°F Clear   58°F Clear   60°F Clear   61°F Clear   58°F Clear   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 11:06 AM PST