Loading...
HomeMy WebLinkAbout2022-06-16FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 6/16/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - We are cleaning the drain and the level spreader - yard organization is ongoing - We are pulling tubing for the chemical system in the vaults all over the job site - The grouting continues under pipe supports on the MBR slab and the sht - The sample line has been run from the Calcite area to the IPR area - Scissor lift was picked up today 2 Daniel Ford No 90-CHEMICAL FACILITY - Painters are working on this area - Flowmeters are being worked on for this area. - Tubing is being run for the chemical lines - All the copper has been connected 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - site clean up - cleaning up slabs on the northern side of the projects - cleaning up rocks at both entrances on the asphalt - Monthly maintenance is being performed on Safe Filter, RO, Calcite and a few other misc areas 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We removed blower 2 motor for the Cassette tank at the direction of the SUEZ rep 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - The supports are being grouted - Temp supports are being moved and the holes patched back in   FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 11:10 AM PST          MANPOWER LOG 14 Workers  |   112.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 11:10 AM PST        No.Contact/Company Workers # Hours Man Hours Location     9 Dahl Insulation 1 8.0 8.0 90-CHEMICAL FACILITY     Notes:Metal jacket insulated hot water copper lines. Material cleanup. Demob from Treatment area Created By:  Eric Girten       14  112.0    Manpower Log's Attachments:  9.  Dahl Insulation  0616 DAHL STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 Yes  12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 11:10 AM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 58°F 54°F 0.00 in.0.00 in.0.00 in.78%83%91%50°F 6.6 mph 11 mph 19 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   52°F Clear   56°F Clear   58°F Clear   58°F Clear   57°F Clear   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:20:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 11:10 AM PST