Loading...
HomeMy WebLinkAbout2022-06-17FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 6/17/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - We are cleaning the drain and the level spreader - yard organization is ongoing - We are pulling tubing for the chemical system in the vaults all over the job site - The sample line has been run from the Calcite area to the IPR area 2 Daniel Ford No 90-CHEMICAL FACILITY - We are fixing some of the leaks in the copper 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - site clean up -We are cleaning and maintaining all the pipes and slabs in the calcite and outfall areas. - We performed scheduled maintenance on the outfall, calcite, HVAC and scheduled the Generator to be turned on remotely. 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We removed blower 2 motor for the Cassette tank at the direction of the SUEZ rep. (extra work ticket created) - We removed the old and installed the angle body air valves in the top of both MBR trains. 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - The supports are being grouted - Temp supports are being moved and the holes patched back in 6 Ernie Peterson No 00-GENERAL Notes Log's Attachments:   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 11:11 AM PST        6.  KCI Environmental Inc 6-17-2022 - Rock Mulch - STA FILL.pdf   MANPOWER LOG 16 Workers  |   128.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 11:11 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    9 KCI Environmental 3 8.0 24.0 00-GENERAL     Notes:Created By:  Ernie Peterson      16  128.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 Yes  12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 11:11 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:00PM   Suez Water Technologies & Solutions Motor Control Inc Pilot Light    Comments:Created By: Monica Weiss 2 02:00PM   Miner's Ace Hardware 740724 Duct Tape    Comments:Clearing Drains Created By: Monica Weiss 3 02:00PM   BOERGER Return for Repair    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.06.17 Motor Controls Inc Pilot Light.pdf 2.  2022.06.17 Miner 740724 Duct TApe .pdf   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 11:11 AM PST        3.  2022.06.17 Boerger BOL for Return.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 57°F 54°F 0.00 in.0.00 in.0.00 in.78%85%92%49°F 6.3 mph 11 mph 18 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   51°F Partly Cloudy   55°F Partly Cloudy   56°F Clear   58°F Clear   57°F Clear   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 11:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 11:11 AM PST