HomeMy WebLinkAbout2022-06-17FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 6/17/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- We are cleaning the drain and the level spreader
- yard organization is ongoing
- We are pulling tubing for the chemical system in the vaults
all over the job site
- The sample line has been run from the Calcite area to the
IPR area
2 Daniel Ford No 90-CHEMICAL FACILITY - We are fixing some of the leaks in the copper
3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- site clean up
-We are cleaning and maintaining all the pipes and slabs in
the calcite and outfall areas.
- We performed scheduled maintenance on the outfall,
calcite, HVAC and scheduled the Generator to be turned on
remotely.
4 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- We removed blower 2 motor for the Cassette tank at the
direction of the SUEZ rep. (extra work ticket created)
- We removed the old and installed the angle body air valves
in the top of both MBR trains.
5 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- The supports are being grouted
- Temp supports are being moved and the holes patched
back in
6 Ernie Peterson No 00-GENERAL
Notes Log's Attachments:
FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 11:11 AM PST
6.
KCI Environmental Inc 6-17-2022 - Rock Mulch - STA FILL.pdf
MANPOWER LOG 16 Workers | 128.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 ELECTRICRAFT, INC.6 8.0 48.0
Notes:Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Manny Hernandez
Jaren Unfried
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 11:11 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
6 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Johnathan Torres
Created By: Daniel Ford
9 KCI Environmental 3 8.0 24.0 00-GENERAL
Notes:Created By: Ernie Peterson
16 128.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 Yes 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 11:11 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 02:00PM Suez Water Technologies &
Solutions
Motor Control Inc Pilot Light
Comments:Created By: Monica Weiss
2 02:00PM Miner's Ace Hardware 740724 Duct Tape
Comments:Clearing Drains
Created By: Monica Weiss
3 02:00PM BOERGER Return for Repair
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.06.17 Motor Controls Inc Pilot Light.pdf
2.
2022.06.17 Miner 740724 Duct TApe .pdf
FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 11:11 AM PST
3.
2022.06.17 Boerger BOL for Return.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
50°F 57°F 54°F 0.00 in.0.00 in.0.00 in.78%85%92%49°F 6.3 mph 11 mph 18 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Cloudy
51°F
Partly Cloudy
55°F
Partly Cloudy
56°F
Clear
58°F
Clear
57°F
Clear
54°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 11:15:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 11:11 AM PST