Loading...
HomeMy WebLinkAbout2022-06-20FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 6/20/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - We are pulling tubing for the chemical system in the vaults all over the job site 2 Daniel Ford No 90-CHEMICAL FACILITY - We are fixing some of the leaks in the copper 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - pressure washing the headworks, odor control, fine screens, and the mbr area. - performed scheduled maintenance for the Headworks, odor control, fine screens, BNR, and MBR. 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We removed blower 2 motor for the Cassette tank at the direction of the SUEZ rep. (extra work ticket created) - The air lines for the new angle body air valve are being worked on 5 Monica Weiss No SAFETY TBT SWT 6 Ernie Peterson No 00-GENERAL Begin Irrigation System Installation Notes Log's Attachments: 5.  06.20 SWT.pdf 06.20 TBT.pdf   FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 11:11 AM PST        6.  KCI Environmental Inc 6-20-2022 - Irrigation - STA FILL.pdf   MANPOWER LOG 15 Workers  |   120.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 11:11 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 KCI Environmental 3 8.0 24.0 00-GENERAL     Notes:Begin Irrigation System Installation Created By:  Ernie Peterson       15  120.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 Yes  12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 61°F 56°F 0.00 in.0.00 in.0.00 in.67%78%89%49°F 4.6 mph 8 mph 13 mph   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 11:11 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   52°F Clear   58°F Clear   59°F Clear   60°F Clear   60°F Clear   57°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 09:35:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 11:11 AM PST