Loading...
HomeMy WebLinkAbout2022-06-22FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 6/22/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - We are pulling tubing for the chemical system in the vaults all over the job site. -Chemical lines are being tied in. - Mud is being cleaned out of the v ditch - We are cleaning all the excess mud out of the level spreaders. - backfilling by the dewatering slab 2 Daniel Ford No 90-CHEMICAL FACILITY - We are fixing some of the leaks in the copper and replacing a couple defective unions. 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - We drained the Safe Filter and will clean the entire tank out. - performed scheduled maintenance and ran complete water loops for the whole system today. 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Punch list items are being worked on in this area. - We are supplying support for the Suez Rep 5 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown We are working on Punch list items in this area 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility Punch list items in this area. 7 Ernie Peterson No 00-GENERAL Notes Log's Attachments:   FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 11:12 AM PST        7.  KCI Environmental Inc 6-22-2022 - Irrigation - STA FILL.pdf   MANPOWER LOG 15 Workers  |   120.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 11:12 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 KCI Environmental 3 8.0 24.0 00-GENERAL     Notes:Created By:  Ernie Peterson      15  120.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:street plate Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 61°F 55°F 0.00 in.0.00 in.0.00 in.68%89%94%51°F 3.7 mph 6 mph 10 mph   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 11:12 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   52°F Clear   53°F Clear   57°F Clear   58°F Clear   56°F Clear   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 08:05:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 11:12 AM PST