Loading...
HomeMy WebLinkAbout2022-06-23FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 6/23/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - We are pulling tubing for the chemical system in the vaults all over the job site. -Chemical lines are being tied in. - Mud is being cleaned out of the v ditch - We are cleaning all the excess mud out of the level spreaders. - backfilling by the dewatering slab 2 Daniel Ford No 90-CHEMICAL FACILITY - All leaks are fixed and we are up and running in this area. 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - The SAFE filter was completely cleaned and filled back up - Water Has been pulled from the bottom of the Safe settling tank and being run through the belt press. 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Punch list items are being worked on in this area. - Troy spent almost all day working on the air compressors and air lines for the suez rep. 5 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown We are working on Punch list items in this area 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility Punch list items in this area. 7 Ernie Peterson No 00-GENERAL Notes Log's Attachments:   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 11:12 AM PST        7.  KCI Environmental Inc 6-23-2022 - Irrigation - STA FILL.pdf   MANPOWER LOG 16 Workers  |   128.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 11:12 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 Dahl Insulation 1 8.0 8.0 90-CHEMICAL FACILITY     Notes:Insulate/metal jacket hot water copper Created By:  Eric Girten    9 KCI Environmental 3 8.0 24.0 00-GENERAL     Notes:Created By:  Ernie Peterson      16  128.0    Manpower Log's Attachments:  8.  Dahl Insulation  0623 DAHL STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 11:12 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:street plate Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:00PM   Miner's Ace Hardware 741195 Torch    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.06.23 Miners 741195 Torch.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 58°F 55°F 0.00 in.0.00 in.0.00 in.85%92%97%52°F 3.6 mph 7 mph 11 mph   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 11:12 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   52°F Clear   55°F Clear   57°F Clear   58°F Clear   57°F Partly Cloudy   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:30:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 11:12 AM PST