Daily Log: Monday 6/27/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- Work continues on the drain pipes and cleaning out the
level spreaders
2 Daniel Ford No 90-CHEMICAL FACILITY - We finished connecting the chemical pipes in this building.
3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- All scheduled maintenance was performed for the
headworks, odor control, fine screens, BNR, MBR, and the
WAS system.
- The WAS tank is being drained and cleaned
4 Daniel Ford No 95-OPERATIONS
BUILDING
- drywall is being cut and removed from one side of walls
5 Daniel Ford No 96-MAINTENANCE
BUILDING
- We are doing some more work on the floor sloping for the
drains
6 Ernie Peterson No 00-GENERAL
Notes Log's Attachments:
6.
KCI Environmental Inc 6-27-2022 - Irrigation - STA FILL.pdf KCI daily - 6-27-2022.pdf
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 11:13 AM PST
MANPOWER LOG 18 Workers | 144.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 ELECTRICRAFT, INC.6 8.0 48.0
Notes:Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Manny Hernandez
Jaren Unfried
Daniel Waddle
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Johnathan Torres
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 11:13 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Cement Masons
- Daniel Sheslingoff
Created By: Daniel Ford
10 Dahl Insulation 1 8.0 8.0
Notes:Created By: Monica Weiss
11 Dahl Insulation 1 8.0 8.0 90-CHEMICAL
FACILITY
Notes:Insulate/metal jacket hot water copper
Created By: Eric Girten
12 KCI Environmental 3 8.0 24.0 00-GENERAL
Notes:Created By: Ernie Peterson
18 144.0
Manpower Log's Attachments:
10. Dahl Insulation
0627 DAHL STA.pdf
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 Shoretec No 05:45AM
Notes:trench plates
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 11:13 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
Created By: Daniel Ford
3 Shoretec No 05:45AM
Notes:trench box
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 02:00PM Shore-Tek Inc.Trench Plate for Trench Drain
Comments:Contract Work
Created By: Monica Weiss
2 02:00PM Variable Speed Solutions MCI Light and Mechanical Seal
Comments:Created By: Monica Weiss
3 02:00PM McMaster-CARR 97.97.01028 Hooks
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.06.27 Shoretek Trench Plates Tr Drain.pdf
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 11:13 AM PST
2.
2022.06.27 Motor Controls Inc VSS Light Mech Seal.pdf
3.
2022.06.27 Mcmaster Carr 97.97.01028.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
52°F 60°F 55°F 0.00 in.0.00 in.0.00 in.77%90%97%52°F 4.2 mph 7 mph 12 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
53°F
Clear
55°F
Clear
58°F
Clear
61°F
Clear
57°F
Clear
55°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:15:00 AM No
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 11:13 AM PST