Loading...
HomeMy WebLinkAbout2022-06-27FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 6/27/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - Work continues on the drain pipes and cleaning out the level spreaders 2 Daniel Ford No 90-CHEMICAL FACILITY - We finished connecting the chemical pipes in this building. 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - All scheduled maintenance was performed for the headworks, odor control, fine screens, BNR, MBR, and the WAS system. - The WAS tank is being drained and cleaned 4 Daniel Ford No 95-OPERATIONS BUILDING - drywall is being cut and removed from one side of walls 5 Daniel Ford No 96-MAINTENANCE BUILDING - We are doing some more work on the floor sloping for the drains 6 Ernie Peterson No 00-GENERAL Notes Log's Attachments: 6.  KCI Environmental Inc 6-27-2022 - Irrigation - STA FILL.pdf KCI daily - 6-27-2022.pdf   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 11:13 AM PST          MANPOWER LOG 18 Workers  |   144.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Daniel Waddle Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 11:13 AM PST        No.Contact/Company Workers # Hours Man Hours Location     9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Masons - Daniel Sheslingoff Created By:  Daniel Ford    10 Dahl Insulation 1 8.0 8.0     Notes:Created By:  Monica Weiss   11 Dahl Insulation 1 8.0 8.0 90-CHEMICAL FACILITY     Notes:Insulate/metal jacket hot water copper Created By:  Eric Girten    12 KCI Environmental 3 8.0 24.0 00-GENERAL     Notes:Created By:  Ernie Peterson      18  144.0    Manpower Log's Attachments:  10.  Dahl Insulation  0627 DAHL STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 Shoretec No   05:45AM    Notes:trench plates   FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 11:13 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   3 Shoretec No   05:45AM    Notes:trench box Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:00PM   Shore-Tek Inc.Trench Plate for Trench Drain    Comments:Contract Work Created By: Monica Weiss 2 02:00PM   Variable Speed Solutions MCI Light and Mechanical Seal    Comments:Created By: Monica Weiss 3 02:00PM   McMaster-CARR 97.97.01028 Hooks    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.06.27 Shoretek Trench Plates Tr Drain.pdf   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 11:13 AM PST        2.  2022.06.27 Motor Controls Inc VSS Light Mech Seal.pdf 3.  2022.06.27 Mcmaster Carr 97.97.01028.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 60°F 55°F 0.00 in.0.00 in.0.00 in.77%90%97%52°F 4.2 mph 7 mph 12 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   53°F Clear   55°F Clear   58°F Clear   61°F Clear   57°F Clear   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:15:00 AM No     FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 11:13 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 11:13 AM PST