Loading...
HomeMy WebLinkAbout2022-06-28FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 6/28/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - Work continues on the drain pipes and cleaning out the level spreaders - organizing the yard - We are installing SIKA flex at the joints for the manhole near pond 1 and lower level spreader man hole 2 Daniel Ford No 90-CHEMICAL FACILITY - We finished connecting the chemical pipes in this building. 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - A flow meter was removed and shipped out to the manufacturer from the odor control panel - We updated SKADA to include the new settings from Suez. - The Was and Scum tank has been cleaned and drained - scheduled maintenances for the SAfE filter, Calcite contactor's, and the uv system was performed today. - All outfall pumps and IPR pumps were at least bumped today. most were ran all day to complete the water loops - We were pressure washing everything on the BNR and MBR slabs 4 Daniel Ford No 95-OPERATIONS BUILDING - drywall is being cut and removed from one side of walls - We backfilled the backflow preventer at the north east side of this building - We are also spraying a moldicide on some of the exposed 5 Daniel Ford No 96-MAINTENANCE BUILDING - We are doing some more work on the floor sloping for the drains   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 11:13 AM PST          MANPOWER LOG 13 Workers  |   104.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Daniel Waddle Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 11:13 AM PST        No.Contact/Company Workers # Hours Man Hours Location     9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Masons - Daniel Sheslingoff Created By:  Daniel Ford       13  104.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 Shoretec No   05:45AM    Notes:trench plates Created By: Daniel Ford   3 Shoretec No   05:45AM    Notes:trench box Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:00PM   Miner's Ace Hardware 97.97.01040 flood remediation    Comments:Created By: Monica Weiss 2 02:00PM   Miner's Ace Hardware Bug Killer    Comments:97.97.01028 Created By: Monica Weiss 3 02:00PM   Miner's Ace Hardware 97.97.01030 PW Tie In    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 11:13 AM PST        1.  2022.06.28 Miners 97.97.01040.pdf 2.  2022.06.28 Miners Bug Killer 1028.pdf 3.  2022.06.28 Miners PW Tie 97.97.01030.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 76°F 62°F 0.00 in.0.00 in.0.00 in.45%75%98%53°F 5.0 mph 10 mph 14 mph   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 11:13 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   52°F Clear   55°F Clear   76°F Clear   76°F Clear   71°F Clear   64°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 11:13 AM PST