Daily Log: Tuesday 6/28/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- Work continues on the drain pipes and cleaning out the level
spreaders
- organizing the yard
- We are installing SIKA flex at the joints for the manhole near
pond 1 and lower level spreader man hole
2 Daniel Ford No 90-CHEMICAL FACILITY - We finished connecting the chemical pipes in this building.
3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- A flow meter was removed and shipped out to the
manufacturer from the odor control panel
- We updated SKADA to include the new settings from Suez.
- The Was and Scum tank has been cleaned and drained
- scheduled maintenances for the SAfE filter, Calcite
contactor's, and the uv system was performed today.
- All outfall pumps and IPR pumps were at least bumped
today. most were ran all day to complete the water loops
- We were pressure washing everything on the BNR and MBR
slabs
4 Daniel Ford No 95-OPERATIONS
BUILDING
- drywall is being cut and removed from one side of walls
- We backfilled the backflow preventer at the north east side of
this building
- We are also spraying a moldicide on some of the exposed
5 Daniel Ford No 96-MAINTENANCE
BUILDING
- We are doing some more work on the floor sloping for the
drains
FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 11:13 AM PST
MANPOWER LOG 13 Workers | 104.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 ELECTRICRAFT, INC.6 8.0 48.0
Notes:Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Manny Hernandez
Jaren Unfried
Daniel Waddle
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Johnathan Torres
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 11:13 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Cement Masons
- Daniel Sheslingoff
Created By: Daniel Ford
13 104.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 Shoretec No 05:45AM
Notes:trench plates
Created By: Daniel Ford
3 Shoretec No 05:45AM
Notes:trench box
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 02:00PM Miner's Ace Hardware 97.97.01040 flood remediation
Comments:Created By: Monica Weiss
2 02:00PM Miner's Ace Hardware Bug Killer
Comments:97.97.01028
Created By: Monica Weiss
3 02:00PM Miner's Ace Hardware 97.97.01030 PW Tie In
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 11:13 AM PST
1.
2022.06.28 Miners 97.97.01040.pdf
2.
2022.06.28 Miners Bug Killer 1028.pdf
3.
2022.06.28 Miners PW Tie 97.97.01030.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
51°F 76°F 62°F 0.00 in.0.00 in.0.00 in.45%75%98%53°F 5.0 mph 10 mph 14 mph
FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 11:13 AM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
52°F
Clear
55°F
Clear
76°F
Clear
76°F
Clear
71°F
Clear
64°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 05:45:00 AM No
By Date Copies To