Loading...
HomeMy WebLinkAbout2022-06-29FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 6/29/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - Work continues on the drain pipes and cleaning out the level spreaders - organizing the yard - The Man hole at the first level spreader and pond one have been dry packed 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - we worked on the valve for train one in the RO building and got it to work - The Was and Scum tank has been cleaned and drained - scheduled maintenances for the SAfE filter, Calcite contactor's, and the uv system was performed today. - All outfall pumps and IPR pumps were at least bumped today. most were ran all day to complete the water loops - We were pressure washing everything on the BNR and MBR slabs and the SAFE Filter 3 Daniel Ford No 95-OPERATIONS BUILDING - drywall is being cut and removed from one side of walls - We backfilled the backflow preventer at the north east side of this building - We are also spraying a moldicide on some of the exposed . - performed a few tests for show the city what was happening with the flooding. We filled the lift station and turned on all the water in the building. The water came out the drain in the parking lot exactly how it was designed to do. 4 Daniel Ford No 96-MAINTENANCE BUILDING - We are doing some more work on the floor sloping for the drains 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Our Cement mason is sacking and patching the outside of this tank.   FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 11:14 AM PST          MANPOWER LOG 13 Workers  |   104.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Daniel Waddle Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 11:14 AM PST        No.Contact/Company Workers # Hours Man Hours Location     9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Masons - Daniel Sheslingoff Created By:  Daniel Ford       13  104.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 Shoretec No   05:45AM    Notes:trench plates Created By: Daniel Ford   3 Shoretec No   05:45AM    Notes:trench box Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:00PM   Miner's Ace Hardware 97.97.01040 flood remediation    Comments:Created By: Daniel Ford 2 02:00PM   Miner's Ace Hardware Bug Killer    Comments:97.97.01028 Created By: Daniel Ford 3 02:00PM   Miner's Ace Hardware 97.97.01030 PW Tie In    Comments:Created By: Daniel Ford   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 11:14 AM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 55°F 69°F 62°F 0.00 in.0.00 in.0.00 in.60%71%86%53°F 6.5 mph 11 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   58°F Clear   64°F Clear   68°F Clear   69°F Clear   65°F Clear   58°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 11:14 AM PST