HomeMy WebLinkAbout2022-06-30FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Thursday 6/30/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- Work continues on the drain pipes and cleaning out the level
spreaders
- organizing the yard
- The Man hole at the first level spreader and pond one have
been dry packed
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- we worked on the valve for train one in the RO building and
got it to work
- The Was and Scum tank has been cleaned and drained
- scheduled maintenances for the SAfE filter, Calcite
contactor's, and the uv system was performed today.
- All outfall pumps and IPR pumps were at least bumped
today. most were ran all day to complete the water loops
- We were pressure washing everything on the BNR and MBR
slabs and the SAFE Filter
3 Daniel Ford No 95-OPERATIONS
BUILDING
- drywall is being cut and removed from one side of walls
- We backfilled the backflow preventer at the north east side of
this building
- We are also spraying a moldicide on some of the exposed .
- performed a few tests for show the city what was happening
with the flooding. We filled the lift station and turned on all
the water in the building. The water came out the drain in the
parking lot exactly how it was designed to do.
4 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- Our Cement mason is sacking and patching the outside of
this tank.
FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 11:14 AM PST
MANPOWER LOG 14 Workers | 112.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 ELECTRICRAFT, INC.6 8.0 48.0
Notes:Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Manny Hernandez
Jaren Unfried
Daniel Waddle
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Johnathan Torres
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 11:14 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Cement Masons
- Daniel Sheslingoff
Created By: Daniel Ford
14 112.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 Shoretec No 05:45AM
Notes:trench plates
Created By: Daniel Ford
3 Shoretec No 05:45AM
Notes:trench box
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 02:00PM Miner's Ace Hardware 97.97.01040 flood remediation
Comments:Created By: Daniel Ford
2 02:00PM Miner's Ace Hardware Bug Killer
Comments:97.97.01028
Created By: Daniel Ford
3 02:00PM Miner's Ace Hardware 97.97.01030 PW Tie In
Comments:Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 11:14 AM PST
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
52°F 60°F 54°F 0.00 in.0.00 in.0.00 in.84%92%100%52°F 3.9 mph 7 mph 9 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Cloudy
53°F
Cloudy
53°F
Cloudy
55°F
Clear
60°F
Cloudy
57°F
Fog
54°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 05:45:00 AM No
By Date Copies To