Loading...
HomeMy WebLinkAbout2022-07-05FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 7/5/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - We were installing valves and boxes as well as dong backfill 2 Daniel Ford No 90-CHEMICAL FACILITY - All leaks are fixed and we are up and running in this area. 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Punch list items are being worked on in this area. 5 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown We are working on Punch list items in this area 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility Punch list items in this area.   MANPOWER LOG 11 Workers  |   88.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Daniel Waddle Jaren Unfried Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 12:23 PM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    7 Dahl Insulation 1 8.0 8.0 90-CHEMICAL FACILITY     Notes:Insulate/metal jacket hot water copper Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Operator - Trevor Hernandez Created By:  Monica Weiss    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Labor Apprentice Johnathan Torres Created By:  Monica Weiss       11  88.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 12:23 PM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:street plate Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 57°F 63°F 59°F 0.00 in.0.00 in.0.00 in.84%93%99%57°F 4.3 mph 9 mph 16 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   58°F Partly Cloudy   59°F Partly Cloudy   63°F Partly Cloudy   64°F Partly Cloudy   61°F Partly Cloudy   58°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 10:35:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 12:23 PM PST