HomeMy WebLinkAbout2022-07-06FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Wednesday 7/6/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- We were installing valves and boxes as well as dong backfill
- The trench drains at pond 1 and 2 rea being worked on
2 Daniel Ford No 90-CHEMICAL FACILITY - All leaks are fixed and we are up and running in this area.
3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- We are pressure washing equipment and slabs
-
4 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Punch list items are being worked on in this area.
5 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
- Punch list items in this area.
6 Daniel Ford No 00-GENERAL - Jobsite clean up
- We were installing valves and boxes as well as dong backfill
- The trench drains at pond 1 and 2 rea being worked on
7 Daniel Ford No 90-CHEMICAL FACILITY - All leaks are fixed and we are up and running in this area.
8 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- We are pressure washing equipment and slabs
-
9 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Punch list items are being worked on in this area.
10 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
- Punch list items in this area.
11 Ernie Peterson No 00-GENERAL
Notes Log's Attachments:
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 12:23 PM PST
11.
KCI Environmental Inc 7-6-2022 - Irrigation - STA FILL.pdf KCI daily - 7-6-2022.pdf
MANPOWER LOG 11 Workers | 88.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 ELECTRICRAFT, INC.4 8.0 32.0
Notes:Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Jaren Unfried
Daniel Waddle
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 12:23 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Created By: Daniel Ford
7 Dahl Insulation 1 8.0 8.0 90-CHEMICAL
FACILITY
Notes:Insulate/metal jacket hot water copper
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Jonathan Torres
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Operator
Trevor Hernandez
Created By: Monica Weiss
11 88.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:street plate
Created By: Daniel Ford
4 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
5 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 12:23 PM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
6 shoretech No 07:55AM
Notes:street plate
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 03:35PM Ferguson Enterprises, LLC
Comments:14inch DIP Tee for SAFE Rewor
Created By: Monica Weiss
2 03:35PM Ferguson Enterprises, LLC 471-389 A90
Comments:Created By: Monica Weiss
3 03:35PM Miner's Ace Hardware 742322 analyzer MBR
Comments:Created By: Monica Weiss
4 03:35PM Shore-Tek Inc.Plates for Conveyor
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.07.06 Ferguson 14 DIP Tee SAFE.pdf
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 12:23 PM PST
2.
2022.07.06 Ferguson 471-389 A90.pdf
3.
2022.07.06 Miners 742322 Analyzer MBR.pdf
4.
2022.07.06 Shoretek Plates for Coneyor7243.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
57°F 66°F 60°F 0.00 in.0.00 in.0.00 in.73%89%99%56°F 3.9 mph 9 mph 15 mph
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 12:23 PM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Partly Cloudy
58°F
Cloudy
58°F
Cloudy
63°F
Clear
67°F
Clear
63°F
Clear
58°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 03:50:00 PM No
By Date Copies To