Loading...
HomeMy WebLinkAbout2022-07-07FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 7/7/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - We were installing valves and boxes as well as dong backfill - The trench drains at pond 1 and 2 rea being worked on - We cleared everything from the main parking lot 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - We are pressure washing equipment and slabs - 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Punch list items are being worked on in this area. - We finished the analyzer - Saddle install as well as valves were worked on. 4 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - Punch list items in this area. 5 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - The 14" Tee spool in the safe filter were installed 6 Daniel Ford No 90-CHEMICAL FACILITY - a back flow preventer was installed in this area 7 Daniel Ford No 60-PRODUCT WATER AREA - Fabrication of IPR pump supports has begun   MANPOWER LOG 10 Workers  |   80.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Jaren Unfried     FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 12:23 PM PST        No.Contact/Company Workers # Hours Man Hours Location     Daniel Waddle Created By:  Daniel Ford  3 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Jonathan Torres Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford       10  80.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 12:23 PM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:street plate Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 03:35PM   Miner's Ace Hardware Asphalt    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.07.07 Miners Asphalt .pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 56°F 60°F 58°F 0.00 in.0.00 in.0.00 in.83%91%99%55°F 4.9 mph 9 mph 14 mph   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 12:23 PM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   56°F Clear   58°F Clear   61°F Clear   61°F Clear   59°F Clear   58°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 12:23 PM PST