No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- We were installing valves and boxes as well as dong backfill
- The trench drains at pond 1 and 2 rea being worked on
- We cleared everything from the main parking lot
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- We are pressure washing equipment and slabs
-
3 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Punch list items are being worked on in this area.
- We finished the analyzer
- Saddle install as well as valves were worked on.
4 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
- Punch list items in this area.
5 Daniel Ford No 70-RESIDUALS AREA>73-
Residuals Area - SAFE Filter
System
- The 14" Tee spool in the safe filter were installed
6 Daniel Ford No 90-CHEMICAL FACILITY - a back flow preventer was installed in this area
7 Daniel Ford No 60-PRODUCT WATER AREA - Fabrication of IPR pump supports has begun
MANPOWER LOG 10 Workers | 80.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 ELECTRICRAFT, INC.6 8.0 48.0
Notes:Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Jaren Unfried
FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 12:24 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Daniel Waddle
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Jonathan Torres
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Operators
Trevor Hernandez
Created By: Daniel Ford
10 80.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 12:24 PM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:street plate
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 03:35PM Ferguson Enterprises, LLC 1 1/2 inch adapter
Comments:Created By: Monica Weiss
2 03:35PM Ferguson Enterprises, LLC 471-395
Comments:Created By: Monica Weiss
3 03:35PM HARRINGTON INDUSTRIAL
PLASTICS LLC
471-392 Tubing chemical
Comments:Created By: Monica Weiss
4 03:35PM THE HOME DEPOT Asphalt for Punchlist street
Comments:Created By: Monica Weiss
5 03:35PM Xylem Inc.Head Motor
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.07.08 Ferguson 1 12in Adapter.pdf
FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 12:24 PM PST
2.
2022.07.08 Ferguson 471-395.pdf
3.
2022.07.08 Harrington 471-392 Tubing.pdf
4.
2022.07.08 Home Depot Blacktop Punchlist.pdf
FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 12:24 PM PST
5.
2022.07.08 Xylem Head Motor.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
53°F 65°F 58°F 0.00 in.0.00 in.0.00 in.82%90%96%54°F 3.0 mph 5 mph 7 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Cloudy
53°F
Partly Cloudy
57°F
Cloudy
56°F
Partly Cloudy
65°F
Cloudy
63°F
Cloudy
58°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 01:50:00 PM No
By Date Copies To