Loading...
HomeMy WebLinkAbout2022-07-11FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 7/11/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - The trench drains at pond 1 and 2 are being worked on - the 24 inch declor pipe was being installed 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - We added chlorine to the system and were running the RAS loop all day to clean up the water quality - The Safe Filter was drained and completely cleaned out - We resumed cleaning and dusting of equipment 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Punch list items are being worked on in this area. 4 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - The vendor for this system showed up today. 5 Daniel Ford No 60-PRODUCT WATER AREA - We are installing the supports for the IPR pumps in this area   MANPOWER LOG 6 Workers  |   48.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Daniel Waddle Manny Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 12:24 PM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Jonathan Torres Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford       6  48.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box   FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 12:24 PM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 03:35PM   autozone Dewatering    Comments:Created By: Monica Weiss 2 03:35PM   Ferguson Enterprises, LLC 6in 45 BNR Repairs    Comments:Created By: Monica Weiss 3 03:35PM   Ferguson Enterprises, LLC 6in Coupling    Comments:BNR Redesign Created By: Monica Weiss 4 03:35PM   McMaster-CARR Connectors Tubing    Comments:Created By: Monica Weiss 5 03:35PM   Ferguson Enterprises, LLC 6in 90 BNR Fix    Comments:Created By: Monica Weiss 6 03:35PM   Ferguson Enterprises, LLC 6in 90 additional    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.07.10 Autozone Dewatering.pdf   FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 12:24 PM PST        2.  2022.07.10 ferguson 6in 45.pdf 3.  2022.07.10 Ferguson 6in coup.pdf 4.  2022.07.10 Mcmaster Carr 9530-1 Connectors.pdf   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 12:24 PM PST        5.  2022.07.11 ferguson 6in 90 pvc BNR Fix.pdf 6.  2022.07.11 Ferguson 6in PVC El.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 60°F 56°F 0.00 in.0.00 in.0.00 in.84%92%98%53°F 3.6 mph 6 mph 10 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   53°F Partly Cloudy   55°F Clear   59°F Clear   60°F Clear   57°F Partly Cloudy   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 03:10:00 PM No     FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 12:24 PM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 12:24 PM PST