HomeMy WebLinkAbout2022-07-11FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 7/11/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- The trench drains at pond 1 and 2 are being worked on
- the 24 inch declor pipe was being installed
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- We added chlorine to the system and were running the RAS
loop all day to clean up the water quality
- The Safe Filter was drained and completely cleaned out
- We resumed cleaning and dusting of equipment
3 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Punch list items are being worked on in this area.
4 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
- The vendor for this system showed up today.
5 Daniel Ford No 60-PRODUCT WATER AREA - We are installing the supports for the IPR pumps in this area
MANPOWER LOG 6 Workers | 48.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Daniel Waddle
Manny Hernandez
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 12:24 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
2 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Jonathan Torres
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Operators
Trevor Hernandez
Created By: Daniel Ford
6 48.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 12:24 PM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 03:35PM autozone Dewatering
Comments:Created By: Monica Weiss
2 03:35PM Ferguson Enterprises, LLC 6in 45 BNR Repairs
Comments:Created By: Monica Weiss
3 03:35PM Ferguson Enterprises, LLC 6in Coupling
Comments:BNR Redesign
Created By: Monica Weiss
4 03:35PM McMaster-CARR Connectors Tubing
Comments:Created By: Monica Weiss
5 03:35PM Ferguson Enterprises, LLC 6in 90 BNR Fix
Comments:Created By: Monica Weiss
6 03:35PM Ferguson Enterprises, LLC 6in 90 additional
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.07.10 Autozone Dewatering.pdf
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 12:24 PM PST
2.
2022.07.10 ferguson 6in 45.pdf
3.
2022.07.10 Ferguson 6in coup.pdf
4.
2022.07.10 Mcmaster Carr 9530-1 Connectors.pdf
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 12:24 PM PST
5.
2022.07.11 ferguson 6in 90 pvc BNR Fix.pdf
6.
2022.07.11 Ferguson 6in PVC El.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
52°F 60°F 56°F 0.00 in.0.00 in.0.00 in.84%92%98%53°F 3.6 mph 6 mph 10 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Partly Cloudy
53°F
Partly Cloudy
55°F
Clear
59°F
Clear
60°F
Clear
57°F
Partly Cloudy
56°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 03:10:00 PM No
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 12:24 PM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 12:24 PM PST