Loading...
HomeMy WebLinkAbout2022-07-13FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 7/13/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - The trench drains at pond 1 and 2 are being formed - The 24" Decleor pipe is being fabricated today - Access for the conveyor truck is being made today - Property line on the eastern side has been shot in 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - Scheduled maintenance was performed on equipment - deep clean of the Safe filter and water exchange 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Punch list items 4 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - Punch list items 5 Daniel Ford No 60-PRODUCT WATER AREA - Punch list items 6 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Punch list items   MANPOWER LOG 11 Workers  |   88.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Jaren Unfried Daniel Waddle Manny Hernandez     FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 12:25 PM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Jonathan Torres Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Apprentice Micah Pixley Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Journeyman Rick Jenne Created By:  Daniel Ford       11  88.0      FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 12:25 PM PST        Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 03:35PM   Suez Water Technologies & Solutions Electric Motor E&L    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.07.13 Suez Electric Motor E&L.pdf   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 12:25 PM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 65°F 57°F 0.00 in.0.00 in.0.00 in.73%91%100%55°F 4.5 mph 8 mph 12 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   56°F Partly Cloudy   58°F Clear   65°F Clear   61°F Partly Cloudy   60°F Partly Cloudy   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 02:10:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 12:25 PM PST