Loading...
HomeMy WebLinkAbout2022-07-15FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 7/15/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Organizing and clean up 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - Scheduled maintenance was performed on equipment - We chlorinated the entire system and have moved the water everywhere 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Punch list items 4 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - Punch list items 5 Daniel Ford No 60-PRODUCT WATER AREA - Punch list items 6 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Punch list items 7 Ernie Peterson No 00-GENERAL Notes Log's Attachments:   FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 12:26 PM PST        7.  KCI Environmental Inc 7-15-2022 - Irrigation - STA FILL.pdf KCI daily - 7-15-2022.pdf   MANPOWER LOG 10 Workers  |   80.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Jaren Unfried Daniel Waddle Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 12:26 PM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Jonathan Torres Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Apprentice Micah Pixley Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Journeyman Rick Jenne Created By:  Daniel Ford       10  80.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 12:26 PM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 03:35PM   Seton Valve Tag Wire    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.07.15 Seton Valve Tag Wire.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 67°F 60°F 0.00 in.0.00 in.0.00 in.68%85%96%54°F 2.8 mph 5 mph 7 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   55°F Clear   59°F Clear   67°F Clear   67°F Clear   65°F Clear   59°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:30:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 12:26 PM PST