HomeMy WebLinkAbout2022-07-19FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Tuesday 7/19/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - General clean up
- A possum got sucked into the pumps for the sanitary lift
station we pulled both pumps and c
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- Scheduled maintenance was performed on equipment
- More chlorine has been added and moved the water
everywhere.
- We are draining/cleaning the SHT tank and cleaning the
dewatering area
- deep clean of the sht tanks today
- Weekly maintenance
3 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
- Punch list items
MANPOWER LOG 6 Workers | 48.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Jaren Unfried
Manny Hernandez
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 12:27 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Operators
Trevor Hernandez
Created By: Daniel Ford
6 48.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 12:27 PM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 03:35PM CAPITAL FLOW INC Teflon Lined Pipe
Comments:Created By: Monica Weiss
2 03:35PM HARRINGTON INDUSTRIAL
PLASTICS LLC
471-392 Partial Hose
Comments:Created By: Monica Weiss
3 03:35PM HARRINGTON INDUSTRIAL
PLASTICS LLC
471-399 6" VSF
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
Capflo Additional CS Repair.pdf
2022.07.19 Capflo Teflon Lined Pipe.pdf
CAPFLOW CS Repair 7-25-22 (002).pdf
FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 12:27 PM PST
2.
2022.07.19 Harrington 471-392 Partial.pdf
3.
2022.07.19 Harrington 471399 6in VSF.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
54°F 62°F 57°F 0.00 in.0.00 in.0.00 in.80%86%93%53°F 3.6 mph 7 mph 11 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
55°F
Clear
62°F
Clear
60°F
Clear
59°F
Clear
59°F
Clear
55°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 01:15:00 PM No
FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 12:27 PM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 12:27 PM PST