Loading...
HomeMy WebLinkAbout2022-07-28FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 7/28/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Organizing and cleaning job wide 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - Scheduled maintenance was performed on equipment(Safe filter, Dewatering, ro/uv, chem/ calcite - Chlorine arrived today - We purged the lines for the north SHT of all grit and completely cleaned the tank. cleaned the SAFE filter and washed it out through the northern SHT - We ran both water loops today at 3MGD all day (1.5 MGD each way) - We covered the 2 funnel drains with permanent plastic lids to hope stop animals from getting in the sanitary sewer lines 3 Daniel Ford No 50-RO/UV BUILDING - Punch list items 4 Ernie Peterson No 00-GENERAL 5 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items Notes Log's Attachments: 4.  KCI Environmental Inc 7-28-2022 - Landscape - STA FILL.pdf KCI daily - 7-28-2022.pdf   FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 12:34 PM PST          MANPOWER LOG 7 Workers  |   56.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Jaren Unfried Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice carpenter - Micha Pixley Created By:  Daniel Ford       7  56.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 12:34 PM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 59°F 56°F 0.00 in.0.00 in.0.00 in.83%91%97%54°F 4.4 mph 7 mph 12 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   55°F Partly Cloudy   56°F Clear   59°F Clear   59°F Partly Cloudy   57°F Partly Cloudy   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:00:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 12:34 PM PST