Loading...
HomeMy WebLinkAbout2022-08-01FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 8/1/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Rock placement, drainage, and work on the front entrance is being preformed - Punch list items 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - Chlorine was tested today and the level was at 0.24 water loops were run today at 3MGD all day (1.5 MGD each way) - Weekly preventative maintenance was performed on the odor control (A alarm is lit for the fan and its not running) headworks, and the fine screens. 3 Daniel Ford No 50-RO/UV BUILDING - Fabricated and installed the 6" PVC flush line and support - the holes in the overhead pipe supports were all drilled today and we have begun to install the cross supports 4 Daniel Ford No 30-TREATMENT AREA - Plastic was put on the edges of the sun screens for the flow control boxes on the catwalk - Punch list items 5 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list items 6 Daniel Ford No 95-OPERATIONS BUILDING - the leak in the conference room was taken care of today - more drywall was removed today to be in compliance with the mold report from green home solutions. they are scheduled to be back on site on Thursday 8/4 for a final inspection - Josh from Miltimore tile was contacted   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 12:35 PM PST          MANPOWER LOG 6 Workers  |   48.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Elija Pauls Daniel Waddle Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford       6  48.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 12:35 PM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:25PM   Miners 744447 Dewatering    Comments:Created By: Monica Weiss 2 01:25PM   USA Blue Book colorimeter Samples    Comments:Created By: Monica Weiss 3 01:25PM   McMaster-CARR Punchlist    Comments:Created By: Monica Weiss 4 01:25PM   McMaster-CARR Punchlist 2    Comments:Created By: Monica Weiss 5 01:25PM   JB DEWAR, INC    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 12:35 PM PST        1.  2022.08.01Miners 744447 Deawtering.pdf 2.  2022.08.01 USA Bluebook colorimeter sample.pdf 3.  2022.08.01 Mcmaster Carr Punchlist.pdf   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 12:35 PM PST        4.  2022.08.01 Mcmaster Carr Punchlist (2).pdf 5.  2022.08.01 JB Dewar 214511.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 59°F 67°F 63°F 0.00 in.0.01 in.0.01 in.76%84%95%58°F 3.2 mph 7 mph 10 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   61°F Clear   65°F Clear   66°F Partly Cloudy   67°F Partly Cloudy   67°F Partly Cloudy   61°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:30:00 AM No     FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 12:35 PM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 12:35 PM PST