HomeMy WebLinkAbout2022-08-03FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Wednesday 8/3/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - organizing and cleaning up of tools and connexs
-We are working on removing the base and fixing the grade in
the parking lot
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- the safe fiter loop is down for painting and will remain down
until Monday
- The northern SHT tank and the SAFE settling tank were both
drained. clean water was put back in the system and the
sludge from the walls and bottom as scrud and removed from
the system
3 Daniel Ford No 50-RO/UV BUILDING
- Punch list items
4 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- 4 cassettes were delivered today and are being stored in the
maintenance building
MANPOWER LOG 5 Workers | 40.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Elija Pauls
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 12:36 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Operators
Trevor Hernandez
Created By: Daniel Ford
5 40.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 12:36 PM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 01:25PM Suez Water Technologies &
Solutions
Membrane Truck 1
Comments:Created By: Monica Weiss
2 01:25PM CalPortland Trench drain Pads & Collars
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.08.03 SUEZ Membrane 1.pdf
2.
2022.08.03 Calportland Trench Drain Pads Collars.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
56°F 62°F 58°F 0.00 in.0.00 in.0.00 in.83%93%99%57°F 3.7 mph 6 mph 10 mph
FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 12:36 PM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
58°F
Clear
57°F
Clear
62°F
Clear
62°F
Clear
61°F
Clear
58°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 04:50:00 PM No
By Date Copies To
FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 12:36 PM PST