Loading...
HomeMy WebLinkAbout2022-08-08FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 8/8/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - wok on the connexs,laydown yard, and organizing - We are digging out the remaining man hole covers, cutting the asphalt, raising them up, and cleaning the ones we already poured - The remaining Trench drain has been formed up. - We are tracking in and working on the slope compaction for the east slope 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - we added water from the SHT, the remaining water in the product water system, and potable water. - Chlorine was added to the system today. our reading this morning was 0.11 - 3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items 4 Daniel Ford No 50-RO/UV BUILDING - We looked at the chemical system in the RO building today and how to add chemical for testing (Challange test). the drawing was summited to Jorji from Black and Veach - Punch list items 5 Daniel Ford No 20-HEADWORKS AREA - Punch list items   MANPOWER LOG 5 Workers  |   40.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Elija Pauls Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 12:37 PM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford       5  40.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 12:37 PM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:25PM   Seton Valve tags    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.08.08 SETON Valve Tags.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 56°F 64°F 60°F 0.00 in.0.00 in.0.00 in.78%87%96%56°F 4.8 mph 8 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   56°F Clear   61°F Clear   63°F Clear   64°F Clear   63°F Clear   59°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 11:35:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 12:37 PM PST