Loading...
HomeMy WebLinkAbout2022-08-09FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 8/9/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - work on the connexs,laydown yard, and organizing is ongoing - We are working on the front entrance and connecting the potable water line 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - We added water to bring the SAFE loop back on line - Chlorine was added to the system today, we basically ran both loops (BNR and SHT) We Were seeing a reading of 1.31 in the safe filter by 4 pm today - Weekly and monthly maintenance was performed on the headworks, odor control, fine screens, MBR, ro, feed area, dewatering, SHT and the SAFE filter 3 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Punch list items 4 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items 5 Daniel Ford No 20-HEADWORKS AREA - Punch list items   MANPOWER LOG 5 Workers  |   40.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Elija Pauls Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 12:40 PM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford       5  40.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 12:40 PM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:25PM   Suez Water Technologies & Solutions Aerzon Motor Starter    Comments:Created By: Monica Weiss 2 01:25PM   NETZSCH PUMPS NORTH AMERICA LLC Paint    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.08.09 SUEZ Aerzen Motor Starter.pdf 2.  2022.08.09 Netsch Pumps Paint.pdf   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 12:40 PM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 56°F 64°F 60°F 0.00 in.0.00 in.0.00 in.80%89%98%56°F 4.6 mph 7 mph 11 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   57°F Clear   60°F Clear   63°F Clear   64°F Clear   63°F Clear   59°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 12:40 PM PST