Loading...
HomeMy WebLinkAbout2022-08-12FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 8/12/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - working on the connexs,laydown yard, and organizing is ongoing - Punch list items all over the job site 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - We ran both loops at 3 MGD all day split between both loops. - Weekly and monthly maintenance was performed on the headworks, odor control, fine screens, MBR, ro, feed area, dewatering, SHT and the SAFE filter 3 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Punch list items 4 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items were worked on 5 Daniel Ford No 50-RO/UV BUILDING - Punch list Items were worked on   MANPOWER LOG 5 Workers  |   40.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Elija Pauls Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 12:41 PM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford       5  40.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 55°F 71°F 62°F 0.00 in.0.00 in.0.00 in.69%83%98%57°F 4.2 mph 8 mph 11 mph   FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 12:41 PM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Fog   57°F Clear   64°F Clear   70°F Clear   71°F Clear   68°F Clear   61°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:55:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 12:41 PM PST