Loading...
HomeMy WebLinkAbout2022-08-17FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 8/17/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - cleaning asphalt - Punch list items all over the job site - - We worked on the front of the site getting the parking and laydown areas back to where they need to be 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes -We ran both trains today at 3 mgd - Scheduled maintenance was performed - Chlorine was added today 3 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Punch list items 4 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items were worked on 5 Daniel Ford No 50-RO/UV BUILDING - Punch list Items were worked on   MANPOWER LOG 5 Workers  |   40.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Elija Pauls Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 12:44 PM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Danie Sheslingoff Created By:  Daniel Ford       5  40.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 12:44 PM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:25PM   airgas    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.08.17 Airgas 2930.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 60°F 56°F 0.00 in.0.00 in.0.00 in.79%89%95%53°F 3.2 mph 7 mph 11 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   53°F Partly Cloudy   56°F Partly Cloudy   60°F Clear   60°F Clear   58°F Clear   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 12:44 PM PST