HomeMy WebLinkAbout2022-08-19FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 8/19/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - cleaning asphalt
- Punch list items all over the job site - We worked on the front
of the site getting the parking and laydown areas back to
where they need to be
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- We ran both trains today at 3 mgd
- Scheduled maintenance was performed
- Chlorine as added at the end of the day
3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items were worked on
- Cleaning
4 Daniel Ford No 50-RO/UV BUILDING - Punch list Items were worked on
5 Daniel Ford No 96-MAINTENANCE
BUILDING
- Punch list Items were worked on
MANPOWER LOG 4 Workers | 32.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Elija Pauls
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 12:46 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Operators
Trevor Hernandez
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe Fitter
Rick Dayton
Created By: Daniel Ford
4 32.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 01:25PM McMaster-CARR Wire Splice
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 12:46 PM PST
1.
2022.08.20 Mcmaster Carr Wire Splice.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
53°F 68°F 57°F 0.00 in.0.00 in.0.00 in.71%92%100%55°F 3.0 mph 5 mph 7 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Fog
54°F
Fog
53°F
Partly Cloudy
55°F
Clear
69°F
Clear
63°F
Clear
58°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 01:35:00 PM No
By Date Copies To
FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 12:46 PM PST