Loading...
HomeMy WebLinkAbout2022-08-26FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 8/26/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Punch list items all over the job site - We worked on the front of the site getting the parking and laydown areas back to where they need to be - The HDPE PRW pipe has been chlorinated, flushed, and set in the trench at the front entrance. We will finish the connections monday morning 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - We ran both trains today at 3 mgd - Scheduled maintenance was performed 3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items were worked on - Cleaning 4 Daniel Ford No 50-RO/UV BUILDING - Punch list Items were worked on 5 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list Items were worked on 6 Daniel Ford No 96-MAINTENANCE BUILDING - Dry wall is being hung   MANPOWER LOG 8 Workers  |   64.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Elija Pauls Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 12:49 PM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe Fitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Rick Jenne Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Carpenter Micha Pixley Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford       8  64.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 12:49 PM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:25PM   Burt Industrial 11246 Dechlor    Comments:Created By: Monica Weiss 2 01:25PM   Burt Industrial 112389    Comments:Created By: Monica Weiss 3 01:25PM   CalPortland Curb remaining manholes    Comments:Created By: Monica Weiss 4 01:25PM   HACH    Comments:Created By: Monica Weiss 5 01:25PM   Harrington A90 PVDF    Comments:Created By: Monica Weiss 6 01:25PM   Mcmaster Carr PVDF Tee    Comments:Created By: Monica Weiss 7 01:25PM   Miners 746546    Comments:Delay Created By: Monica Weiss 8 01:25PM   Miners 746769    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 12:49 PM PST        1.  2022.08.26 Burt Ind 11246 Dechlor.pdf 2.  2022.08.26 Burt Ind 112389.pdf 3.  2022.08.26 Calportland Curb Remaining Manholes.pdf   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 12:49 PM PST        4.  2022.08.26 HACH.pdf 5.  2022.08.26 Harrington PVDF Tee A90.pdf 6.  2022.08.26 Mcmaster Carr PVDF Tee A50.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 12:49 PM PST        7.  2022.08.26 Miner 746546 Delay.pdf 8.  2022.08.26 Miners drywall 746769.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 53°F 64°F 57°F 0.00 in.0.00 in.0.00 in.79%94%100%55°F 3.2 mph 5 mph 6 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Fog   53°F Fog   54°F Clear   64°F Clear   63°F Cloudy   59°F Fog   57°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:40:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 12:49 PM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 12:49 PM PST