HomeMy WebLinkAbout2022-08-26FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 8/26/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Punch list items all over the job site - We worked on the front
of the site getting the parking and laydown areas back to
where they need to be
- The HDPE PRW pipe has been chlorinated, flushed, and set in
the trench at the front entrance. We will finish the connections
monday morning
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- We ran both trains today at 3 mgd
- Scheduled maintenance was performed
3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items were worked on
- Cleaning
4 Daniel Ford No 50-RO/UV BUILDING - Punch list Items were worked on
5 Daniel Ford No 96-MAINTENANCE
BUILDING
- Punch list Items were worked on
6 Daniel Ford No 96-MAINTENANCE
BUILDING
- Dry wall is being hung
MANPOWER LOG 8 Workers | 64.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Elija Pauls
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 12:49 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Operators
Trevor Hernandez
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe Fitter
Rick Dayton
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter
Rick Jenne
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Carpenter
Micha Pixley
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Cement Mason
Daniel Sheslingoff
Created By: Daniel Ford
8 64.0
Manpower Log's Attachments:
FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 12:49 PM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 01:25PM Burt Industrial 11246 Dechlor
Comments:Created By: Monica Weiss
2 01:25PM Burt Industrial 112389
Comments:Created By: Monica Weiss
3 01:25PM CalPortland Curb remaining manholes
Comments:Created By: Monica Weiss
4 01:25PM HACH
Comments:Created By: Monica Weiss
5 01:25PM Harrington A90 PVDF
Comments:Created By: Monica Weiss
6 01:25PM Mcmaster Carr PVDF Tee
Comments:Created By: Monica Weiss
7 01:25PM Miners 746546
Comments:Delay
Created By: Monica Weiss
8 01:25PM Miners 746769
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 12:49 PM PST
1.
2022.08.26 Burt Ind 11246 Dechlor.pdf
2.
2022.08.26 Burt Ind 112389.pdf
3.
2022.08.26 Calportland Curb Remaining Manholes.pdf
FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 12:49 PM PST
4.
2022.08.26 HACH.pdf
5.
2022.08.26 Harrington PVDF Tee A90.pdf
6.
2022.08.26 Mcmaster Carr PVDF Tee A50.pdf
FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 12:49 PM PST
7.
2022.08.26 Miner 746546 Delay.pdf
8.
2022.08.26 Miners drywall 746769.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
53°F 64°F 57°F 0.00 in.0.00 in.0.00 in.79%94%100%55°F 3.2 mph 5 mph 6 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Fog
53°F
Fog
54°F
Clear
64°F
Clear
63°F
Cloudy
59°F
Fog
57°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:40:00 AM No
FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 12:49 PM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 12:49 PM PST