HomeMy WebLinkAbout2022-08-29FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 8/29/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Punch list items all over the job site
- The HDPE Potable water tie in has been completed
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- We ran both trains today at 3 mgd
- Scheduled maintenance was performed
- The remaining chlorine was added bringing the level up to
3.6 we are not going to add any more chlorine as the
membrane are going to be installed in two weeks
3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items were worked on
- Cleaning
4 Daniel Ford No 50-RO/UV BUILDING - Punch list Items were worked on
5 Daniel Ford No 96-MAINTENANCE
BUILDING
- Punch list Items were worked on
6 Daniel Ford No 96-MAINTENANCE
BUILDING
- Dry wall is being hung
MANPOWER LOG 7 Workers | 56.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 12:50 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Operators
Trevor Hernandez
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter
Rick Jenne
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Cement Mason
Daniel Sheslingoff
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.2 8.0 16.0
Notes:Laborer
Manny Hernandez
Daniel Waddle
Created By: Daniel Ford
7 56.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 12:50 PM PST
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
52°F 64°F 58°F 0.00 in.0.00 in.0.00 in.78%89%100%54°F 3.6 mph 6 mph 6 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Partly Cloudy
54°F
Clear
60°F
Clear
64°F
Cloudy
63°F
Cloudy
60°F
Fog
56°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:40:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 12:50 PM PST