HomeMy WebLinkAbout2022-08-29FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 8/29/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Punch list items all over the job site - The HDPE Potable water tie in has been completed 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - We ran both trains today at 3 mgd - Scheduled maintenance was performed - The remaining chlorine was added bringing the level up to 3.6 we are not going to add any more chlorine as the membrane are going to be installed in two weeks 3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items were worked on - Cleaning 4 Daniel Ford No 50-RO/UV BUILDING - Punch list Items were worked on 5 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list Items were worked on 6 Daniel Ford No 96-MAINTENANCE BUILDING - Dry wall is being hung   MANPOWER LOG 7 Workers  |   56.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 12:50 PM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Rick Jenne Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 8.0 16.0     Notes:Laborer Manny Hernandez Daniel Waddle Created By:  Daniel Ford       7  56.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford       FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 12:50 PM PST        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 64°F 58°F 0.00 in.0.00 in.0.00 in.78%89%100%54°F 3.6 mph 6 mph 6 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   54°F Clear   60°F Clear   64°F Cloudy   63°F Cloudy   60°F Fog   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:40:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 12:50 PM PST