Loading...
HomeMy WebLinkAbout2022-09-07FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 9/7/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Cleaning areas - we removed all plates from the ravine and demobbed from the entire ravine araea 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - we went through the normal PM 3 Daniel Ford No 50-RO/UV BUILDING - Punch list items 4 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items 5 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Punch list items   MANPOWER LOG 6 Workers  |   22.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Dahl Insulation 1 4.0 4.0 00-GENERAL     Notes:Overall site cleanup,for trash and material. Punchlist items. Checkout Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 1.0 1.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 4.0 4.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 12:53 PM PST        No.Contact/Company Workers # Hours Man Hours Location     4 J.R. Filanc Construction Company, Inc.1 1.0 1.0     Notes:Operators Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 4.0 4.0     Notes:Laborer Manny Hernandez Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford       6  22.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:05AM   HARRINGTON INDUSTRIAL PLASTICS LLC Clear split PVC    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 12:53 PM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   2 11:05AM   McMaster-CARR U Bolts Punchlist    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.09.07 Harrington 471-412 Clear split PVC.pdf 2.  2022.09.07 Mcmaster Carr 471-415 Ubolts CPVC Punchlist.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 59°F 76°F 66°F 0.00 in.0.00 in.0.00 in.49%77%93%58°F 2.2 mph 5 mph 5 mph   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 12:53 PM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   62°F Clear   68°F Clear   76°F Clear   74°F Clear   66°F Clear   62°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:00:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 12:53 PM PST