HomeMy WebLinkAbout2022-09-16FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 9/16/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Cleaning areas
- Helping the city and TSI program loops in Skada
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- we went through the normal PM
3 Daniel Ford No 50-RO/UV BUILDING - Punch list items
4 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items
5 Daniel Ford No 70-RESIDUALS AREA>73-
Residuals Area - SAFE Filter
System
- Punch list items
6 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
- Punch list items
7 Daniel Ford No 95-OPERATIONS
BUILDING
- taping and drywall mudding complete
8 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- punch list items have been cleared
MANPOWER LOG 2 Workers | 16.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 12:59 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
2 16.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 11:05AM Burt Industrial Hose for Vac Truck
Comments:Created By: Monica Weiss
2 11:05AM Ferguson Enterprises, LLC CPVC 90el
Comments:Created By: Monica Weiss
3 11:05AM McMaster-CARR Tank fitting
Comments:Created By: Monica Weiss
4 11:05AM Miner's Ace Hardware Deflector plate install parts
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 12:59 PM PST
1.
2022.09.16 Burt Ind 113363 Hose for Vac Truck.pdf
2.
2022.09.16 Ferguson CPVC 90el A50.pdf
3.
2022.09.16 Mcmaster Carr CPVC Tank Fitting.pdf
FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 12:59 PM PST
4.
2022.09.16 Miners Deflector Plate install.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
55°F 63°F 59°F 0.00 in.0.00 in.0.00 in.76%85%94%55°F 7.0 mph 13 mph 19 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
56°F
Clear
60°F
Clear
63°F
Clear
64°F
Clear
61°F
Clear
58°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:10:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 12:59 PM PST