Loading...
HomeMy WebLinkAbout2022-09-23FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 9/23/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Cleaning areas - Helping the city and TSI program loops in Skada 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - we went through the normal PM 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - punch list 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We placed concrete in under the scum/was valves in the BNR tank   MANPOWER LOG 3 Workers  |   24.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    3 1 8.0 8.0     Notes:Pipe fitter rick dayton Created By:  Daniel Ford       3  24.0      FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 01:02 PM PST        Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:05AM   McMaster-CARR CPVC Flanges    Comments:Created By: Monica Weiss 2 11:05AM   CalPortland WAS SCUM FILL    Comments:Created By: Monica Weiss 3 11:05AM   HARRINGTON INDUSTRIAL PLASTICS LLC coupling    Comments:Created By: Monica Weiss 4 11:05AM   grainger tote camlock    Comments:Created By: Monica Weiss 5 11:05AM   HARRINGTON INDUSTRIAL PLASTICS LLC Tote connect    Comments:Created By: Monica Weiss 6 11:05AM   Miner's Ace Hardware Dechlor fitting    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 01:02 PM PST        1.  2022.09.23 Mcmaster Carr CPVC Flange.pdf 2.  2022.09.23 Calportland WAS SCUM FILL MBR.pdf 3.  2022.09.23 Harrington Reducing Coupling.pdf   FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 01:02 PM PST        4.  2022.09.23 Grainger Camlock A90.pdf 5.  2022.09.23 Harrington Tote Connect A90.pdf 6.  2022.09.23 Miners Dechlor Analyzer.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 60°F 76°F 67°F 0.00 in.0.00 in.0.00 in.44%67%92%55°F 5.0 mph 7 mph 13 mph   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 01:02 PM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   69°F Clear   74°F Clear   69°F Clear   70°F Clear   66°F Clear   62°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 09:20:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 01:02 PM PST