Loading...
HomeMy WebLinkAbout2022-09-27FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 9/27/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Cleaning areas - Helping the city and TSI program loops in Skada 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - we went through the normal PM - we are draining all tanks in preparation for seeding 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - commissioning 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - we are pumping out water - Weir walls are being fabricated   MANPOWER LOG 3 Workers  |   24.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    3 1 8.0 8.0     Notes:Pipe fitter Rick dayton Created By:  Daniel Ford       3  24.0      FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 01:02 PM PST        Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:05AM   Ferguson Enterprises, LLC SAFE    Comments:Created By: Monica Weiss 2 11:05AM   Hinson Tire Oil Change    Comments:Created By: Monica Weiss 3 11:05AM   Miner's Ace Hardware chem bldg    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.09.27 Ferguson SAIA SAFE.pdf   FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 01:02 PM PST        2.  2022.09.27 Hinson Tire DFORD Truck.pdf 3.  2022.09.27 Miners Chem bld.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 55°F 63°F 58°F 0.00 in.0.00 in.0.00 in.78%90%99%55°F 5.1 mph 8 mph 12 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   56°F Clear   56°F Clear   60°F Clear   63°F Clear   62°F Clear   60°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 09:20:00 AM No     FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 01:02 PM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 01:02 PM PST