HomeMy WebLinkAbout2022-09-28FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Wednesday 9/28/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 70-RESIDUALS AREA>73-
Residuals Area - SAFE Filter
System
- punch list
2 Daniel Ford No 00-GENERAL - Cleaning areas
- Helping the city and TSI program loops in Skada
3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- we went through the normal PM
- we are draining all tanks in preparation for seeding
4 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- commissioning
5 Daniel Ford No 30-TREATMENT AREA>31-
Treatment Area - BNR
Basins
- we are pumping out water
- Weir walls are being fabricated
MANPOWER LOG 3 Workers | 24.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/24/2023 at 01:03 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
3 1 8.0 8.0
Notes:Pipe fitter
Rick dayton
Created By: Daniel Ford
3 24.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
55°F 64°F 59°F 0.00 in.0.00 in.0.00 in.75%86%95%55°F 4.6 mph 6 mph 10 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
55°F
Clear
59°F
Clear
63°F
Clear
65°F
Clear
62°F
Clear
59°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 01:50:00 PM No
By Date Copies To
FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/24/2023 at 01:03 PM PST