HomeMy WebLinkAbout2022-10-03FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 10/3/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Tanks are being drained in preparation for seeding
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- weekly preventive maintenance performed on MBR, SAFE
filter, dewatering.
3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items
4 Daniel Ford No 70-RESIDUALS AREA>73-
Residuals Area - SAFE Filter
System
- the 20 inch piping was delivered and is being installed
MANPOWER LOG 3 Workers | 24.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter
- Andrew Siliva
Created By: Daniel Ford
3 24.0
Manpower Log's Attachments:
FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 01:04 PM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 03:45PM HARRINGTON INDUSTRIAL
PLASTICS LLC
Chem Hose
Comments:Created By: Monica Weiss
2 03:45PM Lutz Jesco Inj Quill
Comments:Created By: Monica Weiss
3 03:45PM McMaster-CARR Bushing
Comments:Created By: Monica Weiss
4 03:45PM McMaster-CARR chem Fittings
Comments:Created By: Monica Weiss
5 03:45PM Miner's Ace Hardware 749724
Comments:Created By: Monica Weiss
6 03:45PM Miner's Ace Hardware
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 01:04 PM PST
1.
2022.10.03 Harrington Chem.pdf
2.
2022.10.03 Jessco-Lutz IInj Quill.pdf
3.
2022.10.03 Mcmaster Carr Bushing Chem.pdf
FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 01:04 PM PST
4.
2022.10.03 Mcmaster Carr Chem Fittings .pdf
5.
2022.10.03 Miners 749724.pdf
6.
2022.10.03 Miners.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
52°F 70°F 61°F 0.00 in.0.00 in.0.00 in.65%82%99%55°F 4.2 mph 9 mph 12 mph
FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 01:04 PM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
53°F
Clear
64°F
Clear
70°F
Clear
69°F
Clear
65°F
Clear
59°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:15:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 01:04 PM PST