Loading...
HomeMy WebLinkAbout2022-10-04FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 10/4/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Started receiving seed for the plant. it was stored in the SHT tank due to sewage not being ready to be delivered 2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - weekly preventive maintenance performed on MBR, SAFE filter, dewatering. 3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items 4 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - the city was delivering waste water to feed the bugs   MANPOWER LOG 3 Workers  |   24.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter - Andrew Siliva Created By:  Daniel Ford       3  24.0      FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 01:04 PM PST        Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 AHERN RENTAL 8.0 No   12:20PM  00-GENERAL  Notes:Back hoe Created By: Daniel Ford   2 shoretech No   07:55AM    Notes:Trench Box Created By: Daniel Ford   3 shoretech No   07:55AM    Notes:8 street plates Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:55PM   HARRINGTON INDUSTRIAL PLASTICS LLC 2in Diaphragm Valve    Comments:Created By: Monica Weiss 2 12:55PM   Miner's Ace Hardware 749819    Comments:Created By: Monica Weiss 3 12:55PM   Suez Water Technologies & Solutions Connector Hardware    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 01:04 PM PST        1.  2022.10.04 Harrington 2in diaphragm valve.pdf 2.  2022.10.04 Miners 749819.pdf 3.  2022.10.04 Suez Connector hardware.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 55°F 63°F 59°F 0.00 in.0.00 in.0.00 in.78%89%96%55°F 4.7 mph 7 mph 11 mph   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 01:04 PM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   56°F Clear   59°F Clear   63°F Clear   63°F Clear   61°F Clear   58°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:55:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 01:04 PM PST