HomeMy WebLinkAbout2022-10-04FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Tuesday 10/4/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Started receiving seed for the plant. it was stored in the SHT
tank due to sewage not being ready to be delivered
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- weekly preventive maintenance performed on MBR, SAFE
filter, dewatering.
3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items
4 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- the city was delivering waste water to feed the bugs
MANPOWER LOG 3 Workers | 24.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter
- Andrew Siliva
Created By: Daniel Ford
3 24.0
FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 01:04 PM PST
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 12:55PM HARRINGTON INDUSTRIAL
PLASTICS LLC
2in Diaphragm Valve
Comments:Created By: Monica Weiss
2 12:55PM Miner's Ace Hardware 749819
Comments:Created By: Monica Weiss
3 12:55PM Suez Water Technologies &
Solutions
Connector Hardware
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 01:04 PM PST
1.
2022.10.04 Harrington 2in diaphragm valve.pdf
2.
2022.10.04 Miners 749819.pdf
3.
2022.10.04 Suez Connector hardware.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
55°F 63°F 59°F 0.00 in.0.00 in.0.00 in.78%89%96%55°F 4.7 mph 7 mph 11 mph
FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 01:04 PM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
56°F
Clear
59°F
Clear
63°F
Clear
63°F
Clear
61°F
Clear
58°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 05:55:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 01:04 PM PST