HomeMy WebLinkAbout2022-10-07FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 10/7/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Received the last tanker truck seed for the plant. it was
stored in the SHT tank due to sewage not being ready to be
delivered. Then Pacific Petroleum started running waste water
from the old morro bay plamnt
2 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes
- weekly preventive maintenance performed on MBR, SAFE
filter, dewatering.
- We were cleaning out the clogged drain pipes from the v
ditch and pond 2
3 Daniel Ford No 90-CHEMICAL FACILITY - Punch list items
4 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- the city was delivering waste water to feed the bugs trips
were made all day
5 Daniel Ford No 96-MAINTENANCE
BUILDING
- cleaning and organizing this building
MANPOWER LOG 3 Workers | 24.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 01:05 PM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter
- Trevor Hernendez
Created By: Daniel Ford
3 24.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 AHERN RENTAL 8.0 No 12:20PM 00-GENERAL
Notes:Back hoe
Created By: Daniel Ford
2 shoretech No 07:55AM
Notes:Trench Box
Created By: Daniel Ford
3 shoretech No 07:55AM
Notes:8 street plates
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 12:55PM grainger 6 Sampler pumps
Comments:Created By: Monica Weiss
2 12:55PM Miner's Ace Hardware 750151
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 01:05 PM PST
1.
2022.10.08 Grainger 6 sampler pumps.pdf
2.
2022.10.08 Miners 750151.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
52°F 59°F 55°F 0.00 in.0.00 in.0.00 in.84%91%97%53°F 3.9 mph 7 mph 11 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
54°F
Clear
54°F
Clear
57°F
Clear
59°F
Clear
58°F
Clear
56°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 05:55:00 AM No
FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 01:05 PM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 01:05 PM PST