Loading...
HomeMy WebLinkAbout2022-12-29FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 12/29/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - BMP have started to be taken down - its a rainy day and we managed some water - We are continuing to work on the concrete slabs near the door entrances in the RO building 2 Daniel Ford No 50-RO/UV BUILDING - We are putting together the challenge test   MANPOWER LOG 4 Workers  |   32.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 1 8.0 8.0     Notes:Carpenters Matt Ables Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement mason Daniel Sheslingoff Created By:  Daniel Ford       4  32.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/11/2023 at 05:28 PM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 55°F 53°F 0.07 in.0.07 in.1.20 in.69%85%97%49°F 4.2 mph 7 mph 10 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   52°F Cloudy   54°F Cloudy   55°F Cloudy   54°F Cloudy   53°F Rain   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:00:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/11/2023 at 05:28 PM PST