Loading...
HomeMy WebLinkAbout2022-12-30FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 12/30/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - BMP have started to be taken down - its a rainy day and we managed some water - We are solving the problem with the oil separator   MANPOWER LOG 4 Workers  |   32.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0     Notes:Carpenters Matt Ables Santino Santella Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford       4  32.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/11/2023 at 05:28 PM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 58°F 56°F 0.04 in.0.11 in.0.11 in.97%98%99%56°F 3.4 mph 6 mph 8 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   55°F Cloudy   56°F Cloudy   58°F Cloudy   58°F Cloudy   58°F Cloudy   57°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 03:05:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/11/2023 at 05:28 PM PST