Loading...
HomeMy WebLinkAbout2023-01-04FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 1/4/2023    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - BMP have started to be taken down - its a rainy day and we managed some water, cleaned out all swales, and cleaned up all the mud out of the roads - We are chipping out the concrete to get to the pipes for the oil sepperator   MANPOWER LOG 4 Workers  |   20.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 4.0 8.0     Notes:Carpenters Matt Ables Santino Santella Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 4.0 4.0 00-GENERAL     Notes:Labor Ricardo Belmontes Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford       4  20.0    Manpower Log's Attachments:      FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/11/2023 at 05:27 PM PST        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 61°F 56°F 0.30 in.0.30 in.0.52 in.61%83%94%51°F 7.3 mph 13 mph 40 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   57°F Cloudy   59°F Cloudy   60°F Cloudy   59°F Rain   59°F Rain   58°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 10:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/11/2023 at 05:27 PM PST