HomeMy WebLinkAbout2023-01-09FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 1/9/2023
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - We cleaned damage from the storm
-The front entrance was completely reworked for Swppp
issues
- managing water and mud from the rain event
- major Clean up site wide
MANPOWER LOG 1 Workers | 8.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
1 8.0
Manpower Log's Attachments:
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 L-13 Cat Skid Steer 01-02-02335 -
SWPPP
4.0 4.0 Yes 10:50AM 00-GENERAL
Notes:Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/11/2023 at 05:25 PM PST
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
54°F 62°F 58°F 2.00 in.2.29 in.2.29 in.84%92%99%56°F 7.8 mph 14 mph 25 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Rain
61°F
Rain
62°F
Rain
57°F
Rain
60°F
Cloudy
57°F
Cloudy
56°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 10:50:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/11/2023 at 05:25 PM PST