Loading...
HomeMy WebLinkAbout2023-01-10FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 1/10/2023    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - managing water and mud from the rain event - Clean up   MANPOWER LOG 1 Workers  |   8.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford       1  8.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 L-13 Cat Skid Steer 01-02-02335 - SWPPP 4.0 4.0 Yes  10:50AM  00-GENERAL  Notes:Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 53°F 58°F 56°F 0.65 in.2.65 in.2.94 in.77%85%98%52°F 5.3 mph 9 mph 17 mph   FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/11/2023 at 05:25 PM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Rain   58°F Fog   55°F Cloudy   57°F Rain   54°F Clear   54°F Cloudy   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 10:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/11/2023 at 05:25 PM PST