HomeMy WebLinkAbout2023-01-11FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Wednesday 1/11/2023
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - managing water and mud from the rain event
- Clean up
-We cleaned damage from the storm
-The front entrance was completely reworked for Swppp
issues
MANPOWER LOG 3 Workers | 24.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenters
Santino Santella
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor
Ricardo Belmontes
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
3 24.0
Manpower Log's Attachments:
FBV Morro Bay Joint Venture Page 1 of 2 Printed on 1/11/2023 at 05:24 PM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 L-13 Cat Skid Steer 01-02-02335 -
SWPPP
4.0 4.0 Yes 10:50AM 00-GENERAL
Notes:Created By: Daniel Ford
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
51°F 59°F 54°F 0.00 in.0.65 in.2.65 in.72%82%91%50°F 5.7 mph 10 mph 14 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Cloudy
54°F
Cloudy
54°F
Cloudy
58°F
Cloudy
60°F
Partly Cloudy
55°F
Clear
53°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 10:50:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 2 of 2 Printed on 1/11/2023 at 05:24 PM PST